Eilmeldung
JP複数のニュース速報:防衛費、皇室典範改正、イラン情勢、サッカーW杯などITGuerra Iran, Trump minaccia "nuovi potenti attacchi". Teheran: "Chiuderemo Hormuz"ARترامب يهدد بضربات جديدة لإيران بعد انتهاء وقف إطلاق النارITAggressione in un ufficio dell'Asp di Palermo: accoltellato un dirigenteARربع النهائي: 8 منتخبات تتنافس على 4 مقاعد في نصف النهائيITGuerra Ucraina, Trump a Zelensky: "Potete produrre missili Patriot". LIVEITOmicidio a Sanremo: Filippo Oldani nega tutto, trasferito in carcereITWimbledon: Sinner in semifinale contro Djokovic, eliminati Paolini e CobolliITAttentato Ranucci, Lavitola si avvale della facoltà di non rispondereARحكم مونديال 2026: من حلم التحكيم إلى غضب الجماهير المصريةJP複数のニュース速報:防衛費、皇室典範改正、イラン情勢、サッカーW杯などITGuerra Iran, Trump minaccia "nuovi potenti attacchi". Teheran: "Chiuderemo Hormuz"ARترامب يهدد بضربات جديدة لإيران بعد انتهاء وقف إطلاق النارITAggressione in un ufficio dell'Asp di Palermo: accoltellato un dirigenteARربع النهائي: 8 منتخبات تتنافس على 4 مقاعد في نصف النهائيITGuerra Ucraina, Trump a Zelensky: "Potete produrre missili Patriot". LIVEITOmicidio a Sanremo: Filippo Oldani nega tutto, trasferito in carcereITWimbledon: Sinner in semifinale contro Djokovic, eliminati Paolini e CobolliITAttentato Ranucci, Lavitola si avvale della facoltà di non rispondereARحكم مونديال 2026: من حلم التحكيم إلى غضب الجماهير المصرية
Newsgather
BackMadhya Pradesh highway upgrade project approved for Rs 4,415.60 crore
Madhya Pradesh highway upgrade project approved for Rs 4,415.60 crore
NACHRICHT
Economic Times03.06.2026Infrastructure3 dk okumaIndia

Madhya Pradesh highway upgrade project approved for Rs 4,415.60 crore

Auf einen Blick

  • India's Cabinet Committee on Economic Affairs approved a Rs 4,415.60 crore project to upgrade and widen NH-347B in Madhya Pradesh.
  • The 233.653 km project will improve connectivity, reduce travel time, and boost economic development.

KI-generierte Zusammenfassung

Warum es wichtig ist

The Cabinet Committee on Economic Affairs approved a project to upgrade and widen NH-347B in Madhya Pradesh. The project aims to improve connectivity, reduce travel time, and boost regional economic development.

Schriftgröße

The Cabinet Committee on Economic Affairs has approved a Rs 4,415.60 crore project to upgrade and widen NH-347B in Madhya Pradesh. The 233.653 km project will enhance connectivity, reduce travel time, and boost regional economic development by improving road safety and linking key economic and social nodes.

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Narendra Modi, on Wednesday has approved upgradation of the existing intermediate lane to 2 Lane with Paved Shoulder Standard (125.01 kms) of Hiwarkhedi -Roshni-Ashapur-Rudhy Section of NH-347B and widening of existing 2 lane to 4 lanes from Deshgaon-Julwaniya Section of NH-347B of length (108. 643 kms) in the State of Madhya Pradesh on Hybrid Annuity Mode at a cost of Rs. 4,415.60 Crore.

According to the Cabinet Committee on Economic Affairs, the proposed upgradation of the Hiwarkhedi-Roshni-Ashapur-Rudhy & Deshgaon-Julwaniya Section of NH-347B in Madhya Pradesh will address severe geometric deficiencies, sharp curves, and congestion in built-up areas across Betul, Khandwa, Khargone & Barwdistricts.

An extended Greenfield Bypass of the Khargone district of 16.20 km length will be developed as part of the instant project.

The project will increase average travel speeds, reduce travel time, and improve overall road safety, fuel efficiency, and vehicle operating costs, thereby enhancing regional mobility and socio-economic development.

The project will provide seamless connectivity to key economic, social, and logistics nodes across Madhya Pradesh.

The upgraded corridor will enhance multi-modal integration by connecting with 06 PM Gati-Shakti Economic Nodes (01 Textile Cluster, 02 Mega Food Park, 01 Industrial park, 02 Super Thermal Power Plants), 5 social nodes (02 Aspirational Districts- Khandwa & Barwani, 03 Tribal Districts-Betul, Khandwa, Khargone) and 5 Logistic Nodes (02 Major Railway Stations, 02 Airports, 01 MMLP), thereby facilitating faster movement of goods and passengers across the region.

The project, spanning a total length of 233.653 km along the Betul-Khandwa-Vadodara corridor, aims to improve regional connectivity and bolster economic growth in the state.

The comprehensive project involves two major sections. The first includes the upgradation of the existing intermediate lane to a 2-lane road with Paved Shoulder standards for the 125.01 km Hiwarkhedi-Roshni-Ashapur-Rudhy section. The second part focuses on widening the existing 2-lane road to a 4-lane highway for the 108.643 km Deshgaon-Julwaniya section. The entire project is being executed under the Hybrid Annuity Mode (HAM).

The total capital cost for the project is estimated at Rs 4,415.60 crore, which includes a civil construction cost of Rs 2,705.08 crore and land acquisition expenses amounting to Rs 432.77 crore.

To ensure smooth traffic flow and bypass congested areas, the project incorporates significant bypass lengths, 70.39 km for the Hiwarkhedi section and 54.273 km for the Deshgaon-Julwaniya section.

The highway is strategically designed to connect major cities and towns, including Betul, Khandwa, Khargone, and Barwani. It also links several critical National Highways such as NH-47, NH-753, NH-347BG, and NH-52, along with State Highway SH-15. This enhanced network will provide better access to the Indore and Nagpur airports, as well as the Betul and Khandwa railway stations.

Beyond transportation, the project serves as a vital link to several economic and industrial nodes. These include a Textile Cluster, two Mega Food Parks, an Industrial Park, and two Super Thermal Power Plants. Furthermore, the corridor is expected to benefit from the Multi-Modal Logistic Park (MMLP) in Indore.

The project is also a major driver for job creation in the region. It is estimated to generate a massive employment potential of 19.50 lakh person-days of direct labour and an additional 23.00 lakh person-days of indirect employment, providing a substantial socio-economic lift to the local population.

Worauf zu achten ist

KI-Ausblick — Möglichkeiten, keine Fakten

  • Improved connectivity and reduced travel times along NH-347B.

    Sehr wahrscheinlich · Mittelfristig

  • Significant job creation in the region.

    Sehr wahrscheinlich · Mittelfristig

  • Boost to regional economic development and socio-economic upliftment.

    Wahrscheinlich · Langfristig

Offene Fragen

  • What is the specific timeline for the project's completion?
  • What are the potential environmental impacts of the widening project?
  • How will the project address land acquisition challenges?
  • What specific economic sectors are expected to benefit most from the improved connectivity?

Verwandte Themen

This article was originally published by Economic Times.

Ähnliche Meldungen

Newly Built Delhi-Dehradun Expressway Develops Potholes After First Rain
In Entwicklung·5 g önce

Newly Built Delhi-Dehradun Expressway Develops Potholes After First Rain

A newly constructed 212km Delhi-Dehradun Expressway, a flagship project costing Rs 12,000 crore, has faced criticism after two large potholes appeared on a stretch in Shamli, Uttar Pradesh, following the first significant rainfall of the season. The potholes, described as deep and wide, caused vehicles to lose balance and at least two cars to suffer bent alloy wheels. Repair crews were deployed, and the potholes have since been fixed.

Times of India
Mehr zu diesem ThemaNH-347B