Newsgather

district administration

Stabil6 Meldungen1 QuellenZuletzt aktualisiert: 2.8.2026

Neueste Meldungen

Doda-Kishtwar Highway Blocked by Landslide Near Hydroelectric Project
In Entwicklung
Welt·6.7.2026KI-Zusammenfassung

Doda-Kishtwar Highway Blocked by Landslide Near Hydroelectric Project

A major landslide near the Kwar hydroelectric power project in Kishtwar, Jammu and Kashmir, blocked the Kishtwar-Doda Highway on Monday due to heavy rainfall. Flash floods and mudslides buried vehicles and construction equipment at the project site, though no casualties were reported. Gates of the Baglihar dam were opened due to increased Chenab river levels.

T
Times of India
1 Min. Lesezeit
Fire Breaks Out at HPCL Pachpadra Refinery in Rajasthan Ahead of PM Modi's Inauguration
Dringend
Business·20.4.2026KI-Zusammenfassung

Fire Breaks Out at HPCL Pachpadra Refinery in Rajasthan Ahead of PM Modi's Inauguration

A massive fire broke out at the HPCL Pachpadra Refinery in Balotra, Rajasthan on Monday afternoon, a day before Prime Minister Narendra Modi was scheduled to inaugurate the refinery on Tuesday. The blaze, reportedly caused by an exchanger explosion at the CDU-VDU side, was brought under control within about two hours. No casualties were reported. Authorities evacuated the area as a precaution. PM Modi's visit and the inauguration ceremony were subsequently cancelled citing security concerns.

T
Times of India
1 Min. Lesezeit