Última hora
ARموكب جنازة المرشد الأعلى الإيراني الراحل آية الله علي خامنئي في طهرانTRMilyonlarca Emekli ve Memurun Temmuz Ayı Maaş Zamları NetleştiKRPolice Book 29 Suspects for Spreading Fake News on Elections, Oil Shipments, Gwangju MovementDEGrüne im Osten: Wahlkampf-Training und Kampf um das "helle Deutschland"TRİşçinin Belinde Unutulan Panç Hayatını KararttıTRAvustralya Sahilinde Bulunan Gizemli Cisimler Fırlatma Aracına Ait OlabilirDEErdbeben in Venezuela: Kritik an Regierung, Solidarität unter den OpfernKRK-축구 혁신위원회 출범…박지성·유승민 공동위원장 맡아ITSky TG24 Live In torna a Milano per un confronto su attualità e sfide futureCN中央网信办、中央社会工作部:集中整治网络平台涉志愿服务违规信息ARموكب جنازة المرشد الأعلى الإيراني الراحل آية الله علي خامنئي في طهرانTRMilyonlarca Emekli ve Memurun Temmuz Ayı Maaş Zamları NetleştiKRPolice Book 29 Suspects for Spreading Fake News on Elections, Oil Shipments, Gwangju MovementDEGrüne im Osten: Wahlkampf-Training und Kampf um das "helle Deutschland"TRİşçinin Belinde Unutulan Panç Hayatını KararttıTRAvustralya Sahilinde Bulunan Gizemli Cisimler Fırlatma Aracına Ait OlabilirDEErdbeben in Venezuela: Kritik an Regierung, Solidarität unter den OpfernKRK-축구 혁신위원회 출범…박지성·유승민 공동위원장 맡아ITSky TG24 Live In torna a Milano per un confronto su attualità e sfide futureCN中央网信办、中央社会工作部:集中整治网络平台涉志愿服务违规信息
Newsgather
BackRajasthan Regulator Rejects 3.2 GW Coal Power Project Again
Rajasthan Regulator Rejects 3.2 GW Coal Power Project Again
NOTICIA
Economic Times16.05.2026Energy1 dk okumaIndia

Rajasthan Regulator Rejects 3.2 GW Coal Power Project Again

En resumen

  • Rajasthan's power regulator has once again rejected a proposed 3.2 GW coal power project, citing the need for utilities to reassess demand and capacity needs.
  • This decision contrasts with other Indian states increasing coal power purchases.

Resumen generado por IA

Por qué importa

Rajasthan's power regulator has rejected a proposed 3.2 GW coal power project for the second time, asking utilities to reassess demand and capacity needs. This comes as other Indian states increase coal power purchases to meet rising demand for round-the-clock electricity.

Tamaño de fuente

NEW DELHI: The power regulator of Rajasthan - India's largest solar power producing state - blocked for a second time a proposed 3.2 gigawatt coal-fired power project, asking utilities to reassess demand and ‌capacity needs ⁠before ⁠proceeding.

Here are some details:

The Rajasthan Electricity Regulatory Commission had already refused permission for the proposed coal power project in November, saying it conflicted with clean energy goals and lacked justification under demand forecasts.

State ⁠power utility ‌Rajasthan Urja Vikas & IT Services ​Ltd, ​however, filed a review petition, arguing ⁠the new capacity was needed to meet ​rising round-the-clock demand.

In an ​order issued late on Friday, the regulator disposed of the review petition without clearing the project.

Live Events

It also directed state utilities to carry out proper resource planning ‌to assess how much coal power was needed for the state.

​Several other ​Indian states ⁠are accelerating their coal power purchases, citing strong power demand and the need for round-the-clock, base-load ​power.

India is aiming to nearly double its non-fossil fuel-based power capacity to 500 GW by 2030 as a part of its 2070 net-zero ambitions.

(You can now subscribe to our Economic Times WhatsApp channel)

(Catch all the Business News, Breaking News and Latest News Updates on The Economic Times.)

Subscribe to The Economic Times Prime and read the ET ePaper online.

...moreless

(You can now subscribe to our Economic Times WhatsApp channel)

(Catch all the Business News, Breaking News and Latest News Updates on The Economic Times.)

Subscribe to The Economic Times Prime and read the ET ePaper online.

...moreless

Preguntas abiertas

  • What specific resource planning metrics will the state utilities use?
  • What are the projected demand and capacity needs for Rajasthan in the short and long term?
  • Will the regulator reconsider the project if new demand forecasts are presented?
  • What are the implications for Rajasthan's renewable energy goals?

Temas relacionados

This article was originally published by Economic Times.

Noticias relacionadas

Más sobre este temacoal power