Dernière minute
RUВ Бахрейне произошли взрывы на фоне воздушной тревогиKR이란, 바레인·쿠웨이트·카타르에 미사일·드론 공격 감행JPJR東海、東海道新幹線に完全個室「スプリーム・クラス・キャビン」導入へKRHeavy Monsoon Rains Cause Widespread Damage Across South KoreaCN挪威備戰8強超謹慎,因飯店噪音問題火速搬家UKPM Hints at Extra Bank Holiday if England Wins World CupJPDuckDuckGo、YouTube動画広告ブロック機能を追加JPMSI Katana 17 HX B14W、Amazonタイムセールで23%オフの20万9800円ESEspaña accede a "importante solicitud de pago" a la OTAN; Trump elogia gestoCN五月天大巨蛋演唱會因颱風延期一場,阿信直播回應歌迷擔憂RUВ Бахрейне произошли взрывы на фоне воздушной тревогиKR이란, 바레인·쿠웨이트·카타르에 미사일·드론 공격 감행JPJR東海、東海道新幹線に完全個室「スプリーム・クラス・キャビン」導入へKRHeavy Monsoon Rains Cause Widespread Damage Across South KoreaCN挪威備戰8強超謹慎,因飯店噪音問題火速搬家UKPM Hints at Extra Bank Holiday if England Wins World CupJPDuckDuckGo、YouTube動画広告ブロック機能を追加JPMSI Katana 17 HX B14W、Amazonタイムセールで23%オフの20万9800円ESEspaña accede a "importante solicitud de pago" a la OTAN; Trump elogia gestoCN五月天大巨蛋演唱會因颱風延期一場,阿信直播回應歌迷擔憂
Newsgather
BackThree-storey administrative building collapses at PCMC Waste-to-Energy plant in Moshi
Three-storey administrative building collapses at PCMC Waste-to-Energy plant in Moshi
Urgent
Times of India15 sa önceMonde1 dk okumaIndia

Three-storey administrative building collapses at PCMC Waste-to-Energy plant in Moshi

L'essentiel

  • A three-storey administrative building at the Pimpri Chinchwad Municipal Corporation's Waste-to-Energy plant in Moshi collapsed amid heavy rain on Wednesday.
  • 15 to 16 workers are feared trapped under the debris.
  • Rescue operations are underway.

Résumé généré par IA

Pourquoi c'est important

A three-storey administrative building at the Pimpri Chinchwad Municipal Corporation's Waste-to-Energy plant in Moshi collapsed amid heavy rain on Wednesday.

Taille de police

A three-storey administrative building at the Pimpri Chinchwad Municipal Corporation's (PCMC) Waste-to-Energy (WTE) plant in Moshi collapsed amid heavy rain on WednesdayImage Credit: TNN

PUNE: A three-storey administrative building at the Pimpri Chinchwad Municipal Corporation's (PCMC) Waste-to-Energy (WTE) plant in Moshi collapsed amid heavy rain on Wednesday, According to officials, 15 to 16 workers are feared trapped under the debris The building collapsed at around 1.45pm, triggering a large-scale rescue operation by the PCMC fire brigade. Personnel from the National Disaster Response Force (NDRF) were also rushed to the site to assist in the search and rescue efforts. A senior fire brigade official said rescue teams had reached the spot and operations were underway. "Some people are believed to be trapped under the debris, but it is too early to confirm the exact number or whether there have been any casualties," the official said. The building housed the administrative offices of the civic body's Waste-to-Energy project, and several employees were inside when the structure gave way, according to officials. Authorities have not yet confirmed the exact number of people trapped or reported any fatalities or injuries. Rescue operations are underway.

Questions ouvertes

  • What caused the collapse?
  • How many people are trapped?
  • Are there any casualties?

Sujets liés

This article was originally published by Times of India.

Articles liés

ट्रंप ने ईरान पर फिर बड़े हमले की चेतावनी दी, कहा- हिसाब बराबर हो चुका है
En développement·21 dk önce

ट्रंप ने ईरान पर फिर बड़े हमले की चेतावनी दी, कहा- हिसाब बराबर हो चुका है

अमेरिकी राष्ट्रपति डोनाल्ड ट्रंप ने ईरान पर मंगलवार रात जोरदार हमला करने का दावा किया और कहा कि संभवतः आज रात फिर हमला होगा। उन्होंने चेतावनी दी कि भविष्य में अहम बुनियादी ढांचे को निशाना बनाया जा सकता है।

BBC हिंदी
Plus sur ce sujetbuilding collapse