Newsgather

Fukushima

Stable27 articles16 sourcesDernière mise à jour: il y a 19 heures

Derniers articles

Fukushima nuclear plant resumes treated water discharge after brief halt
En développement
Monde·11/06/2026Résumé IA

Fukushima nuclear plant resumes treated water discharge after brief halt

Fukushima Daiichi nuclear power plant resumed its treated water discharge on May 15th after a temporary halt due to an alarm. The alarm, triggered during the 20th discharge operation, led to an automatic suspension. Tokyo Electric Power Company identified and replaced a valve suspected of causing the alarm, resuming operations after confirming no equipment issues.

연합뉴스
1 min de lecture