Eilmeldung
Newsgather

fukushima

Stabil27 Meldungen16 QuellenZuletzt aktualisiert: 31.7.2026

Neueste Meldungen

Fukushima nuclear plant resumes treated water discharge after brief halt
In Entwicklung
Welt·11.6.2026KI-Zusammenfassung

Fukushima nuclear plant resumes treated water discharge after brief halt

Fukushima Daiichi nuclear power plant resumed its treated water discharge on May 15th after a temporary halt due to an alarm. The alarm, triggered during the 20th discharge operation, led to an automatic suspension. Tokyo Electric Power Company identified and replaced a valve suspected of causing the alarm, resuming operations after confirming no equipment issues.

연합뉴스
1 Min. Lesezeit