In Entwicklung
Energy·16.05.2026KI-Zusammenfassung
Keban Dam and Hydroelectric Power Plant Opens Gates Due to Heavy Rainfall
Keban Dam, operational since 1974, opened 6 spillway gates on May 11 due to high water levels from heavy rainfall and snowmelt. The dam, with 1330 MW capacity, contributes to energy production, aquaculture, and irrigation.
A
AA Güncel