Newsgather

Fukushima

Estable27 noticias16 fuentesÚltima actualización: hace 10 horas

Últimas noticias

Fukushima nuclear plant resumes treated water discharge after brief halt
En desarrollo
Mundo·11/6/2026Resumen IA

Fukushima nuclear plant resumes treated water discharge after brief halt

Fukushima Daiichi nuclear power plant resumed its treated water discharge on May 15th after a temporary halt due to an alarm. The alarm, triggered during the 20th discharge operation, led to an automatic suspension. Tokyo Electric Power Company identified and replaced a valve suspected of causing the alarm, resuming operations after confirming no equipment issues.

연합뉴스
1 min de lectura