Breaking
ARIran is awaiting Washington and Tel Aviv's calculations regarding the warITUkraine, Zelensky claims attacks on Russian ships in Libya. Drone raid on Rostov. LIVEDE“Consequences for life in Germany are immense” – Russia should prepare a nuclear weapon in spaceARIran is awaiting Washington and Tel Aviv's calculations regarding the warITUkraine, Zelensky claims attacks on Russian ships in Libya. Drone raid on Rostov. LIVEDE“Consequences for life in Germany are immense” – Russia should prepare a nuclear weapon in space
NewsgatherNewsgather
All StoriesWorldSportsFinanceTechScience
Sign In
All StoriesWorldSportsFinanceTechScienceHealthCultureClimatePoliticsSpace
NewsgatherNewsgather

Real-time global news intelligence. Curated by humans, powered by data.

Get the app

Download on theApp StoreGET IT ONGoogle Play
Get the app
Scan with your phone camera

Sections

All StoriesWorldSportsFinanceTechScience

More

HealthCultureClimatePoliticsSpace

Company

AboutEditorial StandardsAdvertisingCareersPressContact

©️ 2026 Newsgather. A product by All Software 24. All rights reserved.

Privacy PolicyCookie PolicyImprintTerms of UseContent and Editorial PolicyRemoval RequestDelete Your AccountAdvertising PolicyContact
Back|1st privately built PSLV set for launch early next year: Isro chief
1st privately built PSLV set for launch early next year: Isro chief
Tech
Times of India·23 minutes ago·Tech·2 min read·🇮🇳India

1st privately built PSLV set for launch early next year: Isro chief

ISRO chief V Narayanan also said India is collaborating with 64 countries and that 434 satellites for 34 countries have launched from Indian soil in the last 12 years.

Quick Look

  • ISRO Chairman V Narayanan said the Gaganyaan mission is not delayed and is in its final phase, with launch at the earliest opportunity.
  • He announced that the first privately built PSLV-N1 rocket is ready for maiden launch in the first quarter of next year, following an NSIL contract with an L&T and HAL consortium for five PSLV rockets worth Rs 860 crore signed in September 2022.
  • India is collaborating with 64 countries, and at least 434 satellites for 34 countries have lifted off from Indian soil in the last 12 years.

AI-generated summary

Why It Matters

ISRO is currently operating 56 space assets in orbit and is fast-tracking satellite launches in collaboration with startups. The number of startups has grown from one to over 440. ISRO's arm NSIL signed a contract in September 2022 with an L&T and HAL consortium for five PSLV rockets worth Rs 860 crore. ISRO and the Semiconductor Lab in Chandigarh have developed a Vikram processor, with the Vikram-32 chip ready for induction.

Font size

ISRO Chairman V Narayanan said the Gaganyaan mission is not delayed.

NEW DELHI: The first privately built Polar Satellite Launch Vehicle (PSLV-N1) is ready for a maiden launch in the “first quarter of next year”, Isro chairman V Narayanan said on Tuesday. He also said govt is fast-tracking satellite launches in collaboration with startups “in a big way” as Isro currently has only 56 space assets in orbit. Talking about foreign collaboration, the Isro chairman said, “India is collaborating with 64 countries... At least 434 satellites for 34 countries have lifted off from Indian soil during the last 12 years.”

Gaganyaan in final phase, says Isro chief

Speaking on the sidelines of the 5th India International Space Conference in Delhi, Isro chief V Narayanan said, “Earlier, it was only Isro that built PSLV with the support of industry. Now, an L&T and HAL consortium has been given five PSLVs (to build). So, the first rocket PSLV-N1 is getting ready and we are targeting to launch it by the first quarter of next year.” Isro’s arm NSIL signed a contract with the consortium in Sept 2022 for Rs 860 crore for five PSLV rockets. Narayanan said, “We need to build a lot of space assets for communication, navigation and earth observation. This can’t be done by govt sector (alone). Isro and INSPACe are hand-holding private companies and you will see its benefit five years from now.

Today, from one startup, their number has come to 440+.” Pointing out that “Gaganyaan is not late”, he said, “It is a technology-intensive activity. We are in the final phase. The rocket and other items are ready. We’re working on the orbital module. At the earliest opportunity, it will be launched.” He said, “Isro and Semiconductor Lab in Chandigarh have developed a Vikram processor. Vikram-32 chip has come out, and we are going to induct it.”

What to Watch

AI outlook — possibilities, not facts

  • PSLV-N1 will launch in the first quarter of next year

    Likely · Within months

  • Gaganyaan will launch at the earliest opportunity

    Possible · Within months

Open Questions

  • ?What is the specific launch date for PSLV-N1 within the first quarter of next year?
  • ?What is the revised timeline for Gaganyaan's crewed mission?
  • ?Which specific startups are collaborating with ISRO on satellite launches?

Related Topics

People
Organizations
Places
Topics
This article was originally published by Times of India.

Quick Look

  • ISRO Chairman V Narayanan said the Gaganyaan mission is not delayed and is in its final phase, with launch at the earliest opportunity.
  • He announced that the first privately built PSLV-N1 rocket is ready for maiden launch in the first quarter of next year, following an NSIL contract with an L&T and HAL consortium for five PSLV rockets worth Rs 860 crore signed in September 2022.
  • India is collaborating with 64 countries, and at least 434 satellites for 34 countries have lifted off from Indian soil in the last 12 years.

AI-generated summary

Story signals

News tone
Positive
Emotional intensity
Medium
News value
Moderate
Global impact
National
Follow-up likelihood
Likely
Relevance window
Weeks

Source & Reliability

Source
Times of India
Story type
Hard news
Source quality
Full
Published
23 minutes ago

Related Stories

More on this topic
L&T bags deal to deploy NVIDIA GPUs at its data centre
Tech·yesterday

L&T bags deal to deploy NVIDIA GPUs at its data centre

Vyoma.AI, through LTN Compute, has secured a multi-year deal worth Rs 2,500 to Rs 5,000 crore to deploy NVIDIA B300 GPUs at its Chennai data centre. Phase 1 supports 250 MW of capacity as part of a gigawatt-scale AI infrastructure hub for commercial-scale AI model training and deployment.

Economic Times
2 min read
AI-generated python image triggers 48-hour emergency search in Italy
Developing·yesterday

AI-generated python image triggers 48-hour emergency search in Italy

A nine-year-old boy in Castelfidardo, Italy, used an AI app to create a fake photo of a python in a toilet, triggering a 48-hour emergency search by firefighters and military specialists before the hoax was uncovered.

TOI World
3 min read
Delhi's Tanjot Singh wins INSPIRE award for wool-and-cotton HEPA alternative
Tech·yesterday

Delhi's Tanjot Singh wins INSPIRE award for wool-and-cotton HEPA alternative

Tanjot Singh, a student of Delhi Public School R.K. Puram, has developed a bio-based alternative to conventional HEPA filter media using compressed wool felt and electrostatic cotton through his initiative PraaNavya. His project won a place among the top 60 national winners at the 12th National Level Exhibition and Project Competition under the INSPIRE-MANAK programme, held at Bharat Mandapam, New Delhi, from October 12 to 14, 2026.

Times of India
3 min read
Zero chinks in the signal as Telcos pass AI stress test
Developing·2 days ago

Zero chinks in the signal as Telcos pass AI stress test

Indian telecom operators have completed government-mandated AI cyberthreat preparedness assessments with no vulnerabilities reported. Equipment vendors conducted AI-based network resilience evaluations, while Trai proposed board-approved policies requiring AI risk classification and critical incident reporting.

Economic Times
3 min read
The new brain drain: China makes AI brains, America buys them, India loses them
Tech·2 days ago

The new brain drain: China makes AI brains, America buys them, India loses them

A Carnegie Endowment study of 10,280 elite AI researchers shows the US and China dominate the field. India faces a dual challenge: a low output of advanced PhDs and a 90% brain drain of its top talent to foreign nations, primarily the US.

Times of India
4 min read
Ex-Google engineer says humans may not have more than 10 years on the clock
Tech·2 days ago

Ex-Google engineer says humans may not have more than 10 years on the clock

Nate Soares, a former Google and Microsoft engineer, claims there is a >50% chance AI will cause human extinction within 10 years. He has stopped saving for retirement, citing the existential threat posed by rapid advancements in machine learning.

Times of India
2 min read
More on this topic
isro
gaganyaan
pslv-n1
isro
V Narayanan
Indian Space Research Organisation
NewSpace India Limited
Larsen & Toubro
Hindustan Aeronautics Limited
New Delhi
Chandigarh
gaganyaan
pslv-n1
nsl
l&t
hal
startups
isro
isro