Union Power Minister Manohar Lal urges states to accelerate grid connectivity and smart meter adoption.
AI-generated summary
The government is working to ensure universal electricity access and improve the financial viability of power distribution companies.
The Centre aims to provide electricity connections for remaining households by March 2027, barring some in remote and hilly areas, Union power minister Manohar Lal said.
Addressing journalists after the two-day Power Ministers’ Conference, he said 14.5 lakh households had been taken up for grid connectivity. “Electricity connections had been completed for around 6.25 lakh households, including those covered through off-grid arrangements,” he said, urging states to complete the remaining work “in mission mode by March next year.”
The minister said difficult terrain and weather could delay connections to some homes in snowbound mountains, forests and border areas. Such households could require another two to four months, depending on conditions, while work elsewhere should be completed by the deadline.
He said the government’s objective was to ensure electricity for every household, round-the-clock supply and affordable power. Discussions at the conference covered generation, transmission, distribution and the financial health of power distribution companies.
States were asked to strengthen billing and collection and accelerate smart metering.
To address concerns about unusually high readings after smart meter installations, the minister said states should consider installing a parallel check meter for three months so consumers could compare readings and have discrepancies examined.
“In many cases, outstanding bills are not appropriately settled and users get a surprise when the smart meters detect discrepancies and present the bills,” he said.
Manohar Lal said states may consider settlement schemes, to prevent accumulated dues from causing concern over the first bill.
The conference also stressed the need for states to enter long-term power purchase agreements rather than depend on short-term purchases to meet their electricity requirements. Officials said states had been encouraged to assess demand and prepare procurement roadmaps to meet their future power requirements.
Energy storage was another focus, with the minister highlighting the need to store surplus solar and wind power for evening and peak-hour demand. Hybrid wind and solar projects were discussed as a way to improve use of transmission infrastructure across different hours.
Officials said battery energy storage was expected to reach between 36 GWh and 40 GWh by the end of the financial year. The minister also called for solarisation of agricultural feeders to supply farmers with daytime electricity and reduce the subsidy burden on states. States were asked to review their resource adequacy plans, covering future demand, generation and transmission needs, and submit reports on proposed changes.
AI outlook — possibilities, not facts
States to implement check meters for three months to resolve smart meter billing disputes.
Likely · Within months
Kaiga Generating Station Unit-1 in Karnataka attained criticality for the second time on Sunday, 600 days after shutdown for life-extension refurbishment including EMCCR and EMFR work. NPCIL announced the milestone, noting the unit previously operated for 25 years and set a world record of 962 days of continuous operation. Kaiga station has four operational units totalling 880 MW, with two additional 700 MW PHWR units under construction.
The Andhra Pradesh government has approved exploring nuclear power generation using Small Modular Reactor technology as an alternative to thermal power, with private sector participation permitted.
The Rialto Bioenergy Facility in California processes up to 1,000 tons of food waste and biosolids daily into renewable natural gas and fertilizer, supporting California's landfill diversion goals. Developed by Anaergia and now owned by Sevana Bioenergy, the $185 million plant produces up to 985,000 MMBtu of RNG annually and won a 2022 Global Water Award.
India has authorized Nepal to import up to 350 MW of electricity from November 17, 2026 to July 31, 2027, as hydropower generation declines and flood-damaged projects strain domestic supply. The arrangement covers 300 MW via three existing transmission lines and 50 MW through a new line.
India has set a 900-gigawatt clean energy target for 2035, nearly doubling its previous 2030 goal, and approved nearly $20 billion in grid upgrades under the Green Energy Corridor plan. Experts warn transmission and storage bottlenecks must be solved for the country to meet its renewable ambitions while coal still supplies about 71% of its electricity.
The Finnish city of Hyvinkää is filling a former gravel pit with 100 million gallons of water to create a massive thermal energy storage facility. The project aims to reduce fossil fuel reliance and stabilize heating costs for residents by storing heat for winter.