
Intel's next generation Razor Lake-S processors are expected to be released in 2028 with Griffin Cove P-Core architecture and LGA 1954 socket compatibility.
AI-generated summary
Intel has targeted the Nova Lake-S platform for the first quarter of 2027. Razor Lake-S is planned for 2028 as the continuation of this platform.
Intel Razor Lake-S will hit the shelves in 2028. Moreover, it is claimed that these desktop processors will be compatible with the LGA 1954 socket used by Nova Lake-S. The socket is the socket where the processor fits into the motherboard. Thus, the platform will be supported for more than one generation.
First of all, the information came from Jaykihn, who shared on X. It is stated that Razor Lake is still planned as a 2028 product. However, it was not announced in which quarter it would be released.
Nova Lake-S is targeted to be released in the first quarter of 2027. That's why Computex 2028 period or the second half of 2028 comes to mind for Intel Razor Lake-S. This is just a guess though.
On the Nova Lake side, there will be S, HX and H configurations. Razor Lake, on the other hand, will cover all of these. There will also be a higher-end AX model.
The biggest innovation of Intel Razor Lake-S will be the transition to Griffin Cove P-Core architecture. P-Core, that is, performance core, is the type of core that does the heavy work. This structure will be built on the architecture of Coyote Cove in Nova Lake-S. It is also expected that new generation production technologies will be used.
Griffin Cove will also be included in the new Xeon family, codenamed Coral Rapids. On the Xeon side, there is SMT (single core running two threads) support. But there will be no SMT in the client series. Therefore, Jaykihn says, it is a similar but separate architecture.
According to previous information, many Nova Lake models have been shifted to Razor Lake. That's why Nova Lake-AX will be released as Razor Lake-AX. Likewise, models with 12 Xe3P iGPU cores have also moved to the Razor Lake family. iGPU means integrated graphics unit inside the processor.
Nova Lake will have options consisting of P-Core or E-Core. However, these will be limited to the Xeon series only. Additionally, models with up to 16 P-Core will be seen in Nova Lake. This is similar to the 12 P-Core models that came with Bartlett Lake-S in the Raptor Lake era, but only in embedded and server systems.
The second quarter of 2027 is targeted for the entry-level Wildcat Lake Refresh "Core Series 4". The computing unit will be based on 18A-P production technology. Moreover, the Panther Cove P-Core and Arctic Wolf E-Core cores will be preserved. Moon Lake, on the other hand, will arrive in the last quarter of 2027 with the 18A compute unit and Darkmont LPE cores.
Intel has not yet made an official announcement about Nova Lake. The company had initially targeted the second half of 2026. But the latest news points to the first half of 2027. New leaks are expected to arrive in the coming months.
AI outlook — possibilities, not facts
Intel Razor Lake-S processors to be released in the second half of 2028.
Possible · Within years

Apple sold the touch-screen MacBook Pro, which it opposed for years. The 16-inch model with M5 Pro processor starts from 234,990 TL in Türkiye. First impressions made with SDNTV's Tolga Cem Küçükyılmaz, the screen quality is impressive, but the price difference cannot cover the touch feature.

A cyber intervention was detected against the official X (Twitter) account of Zonguldak Governorship and it was determined that there was a digital security breach. The Governorship announced that it has initiated technical studies to restore the security of the account and that the process is being followed in coordination with the units. The public was asked not to trust the posts made through the account until security is ensured.

SpaceX CEO Elon Musk announced that they aim to increase the capacity of the Starlink satellite internet network by 100 times in the next 2-3 years with V3 and V4 generation satellites, reaching 80 Pbit/s.
Presidential Communications Director Burhanettin Duran called for digital sovereignty and ethical responsibility at the TRT World Forum 2026, drawing attention to the control of algorithms over information access and journalism.

Epic Games is preparing to offer official Linux support for its digital store. The company, which targets distributions such as Fedora, SteamOS, Cachy and Omarchy, has not yet shared a clear release date.

Honda introduced the first high-end electric mountain bike RN0 at the EICMA 2026 fair in Milan. The model, developed jointly with ROTWILD, attracts attention with its Shimano motor technology and FOX suspension system.