BREAKING NEWS: Radio conversations from the train disaster in Spain were revealed!
Radio recordings between the Madrid Atocha Main Control Center and the machinists revealed the instruction error that led to the accident.
Quick Look
- 68 people died and more than 50 people were injured as a result of the collision of two high-speed trains in Spain.
- El Pais newspaper shared the radio recordings between the control center and the drivers before the accident.
AI-generated summary
Why It Matters
After the system failure at Urda Train Station on the Madrid-Andalusia line, control authority was transferred to Madrid Atocha Main Control Center.
Details of the accident that occurred yesterday at 08:54 local time in Spain, when two high-speed trains collided, began to emerge.
El Paris, one of Spain's most important newspapers, shared the radio conversation records between the train drivers and the Madrid Atocha Main Station unit manager during the accident in which 68 people died and more than 50 passengers were injured, 15 of them seriously.
'THERE WAS A SYSTEM FAILURE'
Accordingly, a system failure occurred at Urda Train Station, one of the checkpoints of the Madrid-Andalusia line. Thereupon, all trains on the railway along the route stopped. Due to system failure, Madrid Atocha Main Control Center took over the Urda Train Station.
According to the audio recordings, two conversations took place between the driver of the stationary Iryo train and the control operator in Atocha, and one conversation between the driver of the AVE train following behind and the same control operator.
'CONTINUE AT NORMAL SPEED'
The technician in charge at Atocha ordered the AVE train, which was 25 kilometers behind the Iryo train, to restart "normal travel" and not "within visual range" with a speed limit of 40 kilometers per hour as stated in the protocol.
He did this without checking to see if there was another train ahead of them blocking the line. The engineer of the Iryo train also received the order to continue "normal driving", but after 7 minutes he reported that the train was still stopped because he could not restart it. However, despite this, the AVE train was instructed to continue at normal speed. A terrible accident occurred because no warning was given in the 5 minutes from the notification that the Iryo engineer was still standing until the moment of impact.
The transcript of the speeches in El Pais newspaper was given as follows.
Atocha Center meeting with AVE Machinist:
-Yes
-At 08.36.
-Yes
- Train driver number 2080. Turn LZB off and on again. Keep driving. Then continue driving at normal speed under the protection of BSL
-At normal speed?
-Yes.
Atocha Headquarters Meeting with Iryo:
Time 08.41: First meeting with Iryo
-Good morning, Atocha. I experienced signal loss while cruising in BSL. The car in front of me is traveling at over 200 in lane 113. But I couldn't get the signal. I am at a standstill. At the entrance to Urda.
'SERIOUSLY DEFECTIVE'
Statements were taken from all employees working at the ADİF railways main control center at the Atocha train station in Madrid, whose serious fault was revealed in the train accident near Toledo, Spain.
SEARCH AND RESCUE WORKS STILL CONTINUE
As one day passed after the train accident near Toledo, Spain, search and rescue efforts continued throughout the night.
Construction equipment and nearly a thousand personnel searched for bodies and injured people in train wagons in the illuminated accident area.
While all facilities, including helicopter drone search dogs, were used, it was announced that the driver on the AVE high-speed train who lost his life was Antanio Acedo Meneses. It was stated that the grandfather and father of the 36-year-old machinist were railway employees, so he chose to become a machinist. It was stated that trainee machinist David Cabanas died in the accident.
THEY CALLED ON SOCIAL MEDIA
Contact centers for families were established in the crash area and the city of Toledo. However, relatives of the accident victims who are outside Spain or far from the accident site are calling on social media to reach their acquaintances.
Renfe, one of the companies involved in the accident, stopped selling tickets for Madrid Andalusia train services until December.
What to Watch
AI outlook — possibilities, not facts
Madrid Andalusia train services were stopped until December.
Very likely · Within months
Open Questions
- Why didn't the control center operator check the status of the train in front of him?
- What is the technical cause of the system failure?





