The State Administration for Market Regulation approved the release of the national standard "Urban Public Facilities Inspection Manhole Cover Operation and Maintenance Service Specifications" (GB/T 48259-2026), which focuses on safety hazards such as missing manhole covers and subsidence, unifies the four core links of inspection, emergency response, repair and maintenance, and file management, and clarifies specific requirements such as intensive inspection of high-risk areas and on-site disposal within 2 hours, providing technical support to ensure the safety of people's travel and improve the management level of urban public facilities.
AI-generated summary
Inspection manhole covers of urban public facilities are related to people's travel safety, but there are long-term safety hazards such as missing, subsidence, and abnormal noises. There is an urgent need to unify and standardize to improve management levels.
China News Service, October 12. According to the website of the State Administration for Market Regulation, the State Administration for Market Regulation (State Standards Administration) recently approved the release of the national standard "Urban Public Facilities Inspection Manhole Cover Operation and Maintenance Service Specifications" (GB/T 48259-2026). This standard focuses on the outstanding risks of "small manhole covers and big people's livelihood" in the city. It aims at potential safety hazards such as missing manhole covers, subsidence, abnormal noise, and overturning, and unifies the full-process service requirements for the operation and maintenance of manhole covers in urban public areas, providing technical support to ensure the safe travel of the people and improve the level of refined management of urban public facilities.
The standard focuses on the four core operation and maintenance links of inspection, emergency response, repair and maintenance, and file management. It also clarifies the operational and maintenance technical provisions that can be implemented in response to the various hidden dangers of manhole covers that are highlighted when traveling by the public. The first is to consolidate the bottom line of inspections. It is clear that daily inspections of manhole covers in regular areas should be carried out at least once a week, and high-risk areas such as densely populated and high-grade roads should be inspected intensively. Internal inspections of manhole covers should be opened no less than once every six months to detect loosening and damage to the well body in advance. The second is to clarify the time limit for emergency response. Establish a 24-hour duty mechanism. If a manhole cover is missing or is in danger of collapse, warning protection must be deployed as soon as possible. After receiving a repair report, the handling personnel will arrive at the scene within 2 hours, and repairs and restoration of major dangers will be completed within 6 hours. The third is to refine maintenance requirements. Quantitative indicators are made for the height difference between the well seat and the road surface, the repair of the well perimeter, and the installation height of the manhole cover in the green belt, and targeted solutions to common problems such as abnormal noise in the manhole cover and tripping, settlement and cracking around the well, etc. The fourth is to implement file traceability management. Promote "one cover, one file", establish paper and electronic ledgers, completely retain location, material, inspection and maintenance records, and realize the traceability of the entire process of manhole cover operation and maintenance.
In the next step, the State Administration for Market Regulation (National Standards Administration) will work with relevant parties to carry out standards publicity and implementation training, promote the implementation of standards and effectively protect people’s travel safety, and help build resilient cities and smart cities.

The 14th Group of the Central Safety Production Assessment and Inspection Team conducted unannounced visits to Xiamen, Zhangzhou and Quanzhou in Fujian Province from September 13 to 18. It was found that some enterprises in Quanzhou have achieved initial results in rectification, but there are still gaps among similar enterprises. Xiamen Xiamen Shipbuilding Industry Co., Ltd. has serious violations such as one hook and multiple cranes, and the fire water supply pipe network of Tong'an Park has not been connected to the household for a long time. There was no water available; the Zhangzhou Beina Garments fire pump room was flooded and had a power outage, resulting in a complete paralysis of the fire protection system. There was no flammable gas alarm device in the butane booster pump area of Pura New Materials and non-explosion-proof electrical appliances were installed at the exhaust outlet, significantly increasing the risk of explosion; some companies chose to move away from the original site for rectification, but the hidden dangers were not eliminated, and safety measures were not completed.

The campaign headquarters of Democratic Progressive Party Kaohsiung mayoral candidate Lai Ruilong was established on October 17. The first large-scale land battle will be held at Fengshan West Station. Former President Tsai Ing-wen was invited to the platform to help out. A total of 5 major campaigns were planned before the election to impact the election.

The Huanggang Port was rebuilt and officially reopened at 6:30 on October 12, launching the new model of "one place, two inspections" and "cooperative inspection, one release". Passengers only need to queue once to complete the entry and exit procedures between Shenzhen and Hong Kong, greatly improving customs clearance efficiency. The first batch of passengers and vehicles passed through in an orderly manner. Hong Kong resident Ms. Huang became the first inbound passenger, and cross-border bus driver Mr. Tam became the first inbound cross-border driver. The port has 134 cooperative inspection fast lanes and 68 manual lanes, and 28 "five-in-one" lanes for vehicle inspection, enabling five-party inspections to be completed at one stop. The port is positioned as a pure travel inspection port. The daily customs clearance flow is designed to be 200,000 in the near future and 300,000 in the long term. It fully covers 24-hour customs clearance needs and is equipped with intelligent supervision facilities and convenient services to effectively improve the convenience and safety of cross-border travel.
Since the beginning of this year, the construction of the national water network has been accelerated, with the number of new major water conservancy projects started in the first three quarters exceeding that of the whole of last year. The Three Gorges Water Transport New Channel Project is the first major landmark project during the "15th Five-Year Plan" period, and construction of the upstream and downstream cofferdams for shipping capacity expansion at Gezhouba Dam has begun. The Shangbaishi Water Conservancy Project in Ningde, Fujian Province seizes the post-flood construction window and will solve the flood problems of more than 600,000 people in eastern Fujian. The Tiaoxi flood control project in the Taihu Lake Basin has started construction, which will make up for the shortcomings in flood control. The construction of 2,012 rural water supply projects has been completed across the country, and the rural tap water penetration rate is expected to reach 97% by the end of the year.
Taiwan leader Lai Ching-te delivered the so-called "Double Ten" speech for the third time during his tenure. He exaggerated the threat from the mainland and advocated military investment and the defense resilience of the whole society. This triggered strong criticism from the Taiwan Affairs Office of the State Council, the Ministry of National Defense and the opposition parties on the island. He was accused of intensifying cross-strait confrontation and deflecting internal conflicts.

The Social Welfare and Health and Environmental Affairs Committee of the Legislative Yuan invited Minister of Health and Welfare Shi Chongliang to give a special report on the effectiveness of the implementation of harm reduction programs and the capacity of drug addiction treatment. In response to the controversy caused by the KMT’s Taipei mayoral candidate Chiang Wanan’s misinterpretation of the harm reduction policy, Democratic Progressive Party legislators Lin Yueqin and Wang Zhengxuqiang Addiction is a disease, and prevention and treatment require science and professionalism. Be wary of electoral language destroying the trust that has been built up over the years in the medical and social welfare sectors. Shi Chongliang said that harm reduction and anti-drug should go hand in hand, reducing health risks through clean needles and alternative treatments and helping addicts return to the public health system.