Breaking
ARIran is awaiting Washington and Tel Aviv's calculations regarding the warITUkraine, Zelensky claims attacks on Russian ships in Libya. Drone raid on Rostov. LIVEDE“Consequences for life in Germany are immense” – Russia should prepare a nuclear weapon in spaceARIran is awaiting Washington and Tel Aviv's calculations regarding the warITUkraine, Zelensky claims attacks on Russian ships in Libya. Drone raid on Rostov. LIVEDE“Consequences for life in Germany are immense” – Russia should prepare a nuclear weapon in space
NewsgatherNewsgather
All StoriesWorldSportsFinanceTechScience
Sign In
All StoriesWorldSportsFinanceTechScienceHealthCultureClimatePoliticsSpace
NewsgatherNewsgather

Real-time global news intelligence. Curated by humans, powered by data.

Get the app

Download on theApp StoreGET IT ONGoogle Play
Get the app
Scan with your phone camera

Sections

All StoriesWorldSportsFinanceTechScience

More

HealthCultureClimatePoliticsSpace

Company

AboutEditorial StandardsAdvertisingCareersPressContact

©️ 2026 Newsgather. A product by All Software 24. All rights reserved.

Privacy PolicyCookie PolicyImprintTerms of UseContent and Editorial PolicyRemoval RequestDelete Your AccountAdvertising PolicyContact
Back|Gyeongnam Province, the ‘North Pole Route hub’, strongly proposes a new route for the national railway network
Gyeongnam Province, the ‘North Pole Route hub’, strongly proposes a new route for the national railway network
Developing
연합뉴스·11/13/2026·Infrastructure·2 min read·🇰🇷South Korea·

Gyeongnam Province, the ‘North Pole Route hub’, strongly proposes a new route for the national railway network

Quick Look

  • Gyeongsangnam-do Province requested the Ministry of Land, Infrastructure and Transport to reflect 11 new routes (788 km) in Gyeongnam, including the Dongdaegu-Changwon-Gadeokdo New Airport High-Speed ​​Railway, in the 5th National Railway Network Construction Plan (2026-2035).
  • Vice Governor Choi Man-rim for Innovation and Growth emphasized that railways are a necessary condition for preventing regional extinction and investing in the country's future.

AI-generated summary

Why It Matters

The national railway network construction plan is a statutory plan for the construction of high-speed, general, and metropolitan railways established by the government every 10 years, and routes must be reflected in this to lead to actual construction.

Font size

At the '5th National Railway Network Construction Plan (2026-2035) Public Opinion Collection' event held at the Specialized Construction Center in Seoul on the 13th, Gyeongsangnam-do explained the justification for Gyeongnam's new routes to be largely reflected in the 5th National Railway Network Construction Plan.

Choi Man-rim, Deputy Governor for Innovation and Growth, emphasized the urgency and national necessity of expanding the Gyeongnam railway network.

Vice-Governor Choi emphasized that the expansion of new railway lines in Gyeongnam is urgently needed to create a base for pioneering the Arctic route, establish an aerospace hub in Sacheon, achieve balanced regional development of the 'five poles and three special forces', and complete national mega projects.

The province has requested the Ministry of Land, Infrastructure and Transport to reflect 11 new routes (788 km) in the 5th national railway network construction plan.

The province is building the Dongdaegu-Changwon-Gadeokdo New Airport high-speed railway (84㎞), which connects the metropolitan area and Gadeokdo New Airport, the CTX Jinhae Line (Changwon Central Station - Jinhae New Port - Gadeokdo New Airport, 38km), which connects ports, airports, and railways, and the Sacheon Aerospace Line (Jinju Station - Aerospace Administration - Samcheonpo, Sacheon and Jinju, which will advance the global aerospace industry capital of Sacheon and Jinju). We hope that 11 routes, including the Daejeon Namhae Line (203 km), which will connect the central region and the southern coastal tourism belt and revitalize the endangered area of western Gyeongsangnam-do, will be included in this national railway network construction plan.

Deputy Governor Choi said, “Railroads are the first necessary condition to prevent regional extinction and a preemptive investment that opens up the country’s future,” and requested, “For the success of the ‘5 Poles and 3 Specials,’ which are national tasks, please actively reflect Gyeongnam’s proposed route in the 5th national railway network.”

The national railway network construction plan is a statutory plan for the construction of high-speed, general, and metropolitan railways established by the government every 10 years.

Only when the route is reflected here can it lead to actual construction.

Open Questions

  • ?Whether Gyeongnam’s 11 routes will actually be reflected in the 5th national railway network construction plan?
  • ?Estimated project cost and construction period for each route
  • ?Ministry of Land, Infrastructure and Transport's review schedule and possibility of reflection

Related Topics

People
Organizations
Places
Topics
This article was originally published by 연합뉴스.

Quick Look

  • Gyeongsangnam-do Province requested the Ministry of Land, Infrastructure and Transport to reflect 11 new routes (788 km) in Gyeongnam, including the Dongdaegu-Changwon-Gadeokdo New Airport High-Speed ​​Railway, in the 5th National Railway Network Construction Plan (2026-2035).
  • Vice Governor Choi Man-rim for Innovation and Growth emphasized that railways are a necessary condition for preventing regional extinction and investing in the country's future.

AI-generated summary

Story signals

News tone
Neutral
News value
Moderate
Urgency
Developing
Follow-up likelihood
Likely
Relevance window
Weeks

Source & Reliability

Source
연합뉴스
Story type
Hard news
Source quality
Full
Published
11/13/2026
View original
Gyeongsangnam-do
national railway network
high-speed rail
Gyeongsangnam-do
Choi Man-rim
Jeonghoon Lee
Ministry of Land, Infrastructure and Transport
Yonhap News
Seoul
Dongdaegu
changwon
national railway network
high-speed rail
Gadeokdo New Airport
Ministry of Land, Infrastructure and Transport
Fat disappearance

Related Stories

More on this topicGyeongsangnam-do
충북도, 청주공항 민간활주로 건설 당위성·최적안 찾는다
Developing·3 days ago

충북도, 청주공항 민간활주로 건설 당위성·최적안 찾는다

충북도가 내년 10월까지 청주국제공항 민간전용 활주로 타당성 조사 용역을 추진한다. 2065년까지 항공수요를 예측하고 최적 입지, 규모, 시설계획 등을 검토해 민간활주로 건설의 당위성을 입증하고 정부 지원을 호소할 계획이다.

연합뉴스
3 min read
Gangwon-do proposes to reflect 10 routes in the national railway network plan... 13 trillion won scale
Infrastructure·11/13/2026

Gangwon-do proposes to reflect 10 routes in the national railway network plan... 13 trillion won scale

Gangwon Special Self-Governing Province requested the Ministry of Land, Infrastructure and Transport to reflect 10 railway lines, including the Chuncheon-Wonju Line and the Pyeongchang-Jeongseon Line, in the 5th National Railway Network Construction Plan (2026-2035), totaling 583.2km. The disclosed project cost is KRW 13.028 trillion, and includes three metropolitan railway lines, including the GTX-B Chuncheon extension and the GTX-D Wonju new construction.

연합뉴스
2 min read
Gyeongbuk proposes to reflect 20 high-speed, general, and metropolitan railway lines in the national railway network
Developing·11/13/2026

Gyeongbuk proposes to reflect 20 high-speed, general, and metropolitan railway lines in the national railway network

Gyeongbuk Province proposed 20 routes, including 2 high-speed railways, 13 general railways, and 5 metropolitan railways, to the government in the 5th national railway network construction plan (2026-2035). The total length is approximately 2,172 km, the project cost is approximately 40 trillion won, and the goal is to achieve balanced regional development and revitalize tourism.

연합뉴스
2 min read
Construction of Ulsan Outer Ring Expressway begins... East-west travel expected to be shortened from 1 hour to 20 minutes
Infrastructure·11/13/2026

Construction of Ulsan Outer Ring Expressway begins... East-west travel expected to be shortened from 1 hour to 20 minutes

Ulsan City holds a groundbreaking ceremony for the Ulsan Outer Ring Expressway. It is scheduled to be completed in the second half of 2032 with a total length of 15.1 km and 4 round-trip lanes, and the project cost is KRW 1.2059 trillion. As it is connected to the Nongso-Gangdong road, the travel time between Duseo-myeon and Gangdong is expected to be shortened from 1 hour to 20 minutes.

연합뉴스
2 min read
Paju Mayor emphasizes win-win development of Paju and Gimpo at Han River Tunnel drilling ceremony
Infrastructure·11/9/2026

Paju Mayor emphasizes win-win development of Paju and Gimpo at Han River Tunnel drilling ceremony

Son Bae-chan, Mayor of Paju, Gyeonggi Province, attended the opening ceremony for the Han River Tunnel TBM on the 2nd Ring Expressway in the metropolitan area on the 6th and emphasized the importance of expanding the metropolitan transportation network connecting Paju and Gimpo. The tunnel from Gimpo to Paju was penetrated on April 17, and this event marked the start of excavation of the tunnel from Paju to Gimpo.

연합뉴스
2 min read
전북, 순창-구림·부전-칠보 국지도 확장·개량 공사 추진
Infrastructure·6/2/2026

전북, 순창-구림·부전-칠보 국지도 확장·개량 공사 추진

전북특별자치도가 총 2,514억 원을 투입해 순창-구림 국지도 55호선 확장 및 부전-칠보 국지도 49호선 시설개량 공사를 추진한다. 이번 사업은 도로 확장 및 선형 개선을 통해 지역 경제 활성화와 접근성 향상에 기여할 것으로 기대된다.

연합뉴스
1 min read
More on this topicGyeongsangnam-do