The bridge is located in Jinniu District, Chengdu. It is a control project of the Chengdu-Chongqing Middle Line High-speed Railway introduced into the Chengdu hub project.
AI-generated summary
The Chengdu-Chongqing High-speed Railway Line is a dedicated line connecting stations and high-speed rail stations. The bridge is located in the core area of Chengdu, and its construction involves crossing existing traffic arteries and rail transit lines.
China News Service, Chengdu, October 13 (Reporter Liu Zhongjun) On the afternoon of October 13, with the completion of the last concrete pouring, the Chengdu-Chongqing Middle Line High-speed Railway Crossing Shahe River Bridge was successfully closed.
It is understood that the bridge is located in Jinniu District, Chengdu. It is a control project for the Chengdu-Chongqing Middle Line High-speed Railway to be introduced into the Chengdu hub project. The total length of the bridge is about 1.47 kilometers. It adopts a cast-in-place continuous beam structure of (62+2×112+62) meters. It spans the Dasha River, the existing Si Maqiao urban main road, Metro Line 3 and the west throat area of the newly built passenger aircraft maintenance station. The entire bridge is designed in three sections: "left and right lines, double lines, and left and right lines". The bridge piers are arranged from No. 0 to No. 39. The section that is closed this time is located between No. 19 and No. 20, just across the Dasha River and Si Maqiao Road.
The so-called EMU line, referred to as "EMU line", is a dedicated line in the railway system connecting the station and the EMU operation station, allowing EMU trains to travel between the station and the maintenance and repair base.
Chen Huiqiang, deputy director of the Engineering Management Department of the Chengdu Construction Headquarters of China Railway Chengdu Bureau Group Co., Ltd., said that the project is located in the core area of the city, with a complex and sensitive surrounding environment. It not only crosses a main traffic road with dense traffic, but also crosses under and over multiple existing rail transit lines. It is difficult to coordinate cross-cutting operations, has high environmental protection control standards, complicated construction procedures, and prominent risks in high-pier operations. It is one of the most difficult node projects in the entire line.
“For high-risk processes such as high pier construction, cross-road operations, and construction adjacent to existing operating railways, the project team implemented real-time stress and linear monitoring of the cast-in-place continuous beam throughout the entire process, and dynamically adjusted construction parameters to ensure that the beam’s linear shape was smooth and smooth, and the internal force met the design requirements. "Wu Zhaoxu, project manager of the Chengdu hub project department of the Chengdu-Chongqing Middle Line High-speed Railway of China Railway No. 8 Bureau, said that in terms of quality control, key processes such as formwork installation, steel bar binding, and concrete pouring are strictly controlled one by one, and the "three inspection system" is implemented. All indicators meet the design and specification requirements.
Construction in urban core areas also has high requirements for environmental protection. The project strictly implements dust control, noise reduction and pollution reduction measures to minimize the impact on surrounding traffic and environment.
It is reported that after the Chengdu-Chongqing Middle Line high-speed rail moving line crosses the Shahe River Bridge and is successfully closed, the travel paths of the EMUs to and from the Chengdu station and the EMU will be efficiently connected. The key choke point of the Chengdu-Chongqing Middle Line high-speed rail moving line project will be opened, and it will also create conditions for the subsequent ancillary and supporting projects to fully roll out the operating surface.

Tonight’s Grand Lotto jackpot was won by the “Wendada Lottery Store” in Fengshan District, Kaohsiung City, with a total prize of NT$350 million. The Mid-Autumn Festival bonus event continues. Four sets of million-dollar prizes will be awarded in this issue, and more will be awarded in the next issue.

The Taiwan Lottery will draw prize numbers for Grand Lotto, 49 Mark Lottery, Today’s Lottery 539, 39 Mark Lottery, 3 Star Lottery and 4 Star Lottery on October 13. The Grand Lotto jackpot numbers are 03, 31, 35, 36, 47, 48, and the special number is 32.

A couple born after 1995 in Ningbo, Zhejiang, who work in Shanghai, recently held a wedding in their hometown with no pick-up, no wedding car, no emcee, and no makeup. The wedding became popular on social media because it was simple and pragmatic and respected the wishes of the elders, triggering social discussions on new wedding customs and the nature of marriage.

A fire broke out in an abandoned factory on Qianfeng Road, Gangshan District, Kaohsiung City on the afternoon of the 13th, and the fire spread to a nearby technology company. The fire department dispatched a large number of manpower to rescue and burn waste wood at the scene. There are no casualties so far. The city government reminds residents in Gangshan, Qiaotou and Yanchao districts to pay attention to air quality.

The underground Tainan Railway is expected to open to traffic this Saturday. Taiwan Railway will carry out key track switching construction on the evening of October 16, affecting 18 trains. On the evening of the same day, the "Last Night: Forever Tainan" commemorative event will be held to bid farewell to the century-old aboveground railway.

A fire near an MTR track at Lam Tin station halted train services between Kwun Tong and Tiu Keng Leng during Hong Kong's Tuesday evening rush hour, stranding commuters on packed platforms.