
The electric car manufacturer is planning a new production hall and wants to significantly increase capacity and the number of employees at the Berlin-Brandenburg location.
AI-generated summary
The Tesla factory in Grünheide is the company's only European production facility. The factory is partly located in a water protection area, which regularly leads to local criticism.
Grünheide. The US electric car manufacturer Tesla wants to pick up the pace with expansion plans at its German factory in Grünheide. A new production hall is planned. The aim is for the second partial approval for the expansion to be submitted at the end of the year, said a spokeswoman for the German Press Agency. The company is making internal preparations for this. How big the hall will be is still unclear. The RBB and the “Märkische Oderzeitung” initially reported.
On the site of Elon Musk's only electric car factory in Europe, Tesla wants to double production according to previous plans from a planned 500,000 cars per year - which has not yet been achieved - to one million per year. The storage capacity of battery cell production is also expected to increase significantly: according to previous plans, to 100 gigawatt hours per year in the future. No additional forest needs to be cleared for this.
Tesla did not abandon its expansion plans even during a slump in sales, but initially put them on hold and made them dependent on a better market situation. Demand is now picking up again and Tesla is bucking the trend in hiring employees. According to Tesla, the factory near Berlin, which opened in March 2022, currently has 12,600 employees. In the meantime the number had fallen below 11,000 employees.
The company wants to increase production in two steps to 7,500 vehicles per week. This corresponds to around 375,000 vehicles per year. To achieve this, 2,000 new employees will be hired. In addition, more than 1,500 new employees are planned for the expansion of battery cell production in Grünheide. A spokeswoman said an additional 2,000 employees have been hired in the past few months.
Two years ago, Tesla received the green light from the state of Brandenburg to take the first step in expanding the plant. At that time, the State Environment Agency issued the first environmental approval for changes and optimization of buildings and facilities that had already been constructed.
According to the company, the second stage involves the construction of the new workshop and logistics space, and the third stage involves the introduction of machines. Environmentalists and residents have concerns about the factory and its expansion because it is partly located in a water protection area.
AI outlook — possibilities, not facts
Submission of the second partial approval for the expansion by the end of the year.
Likely · Within months

Volkswagen is preparing a further recall of several thousand ID family electric cars in Germany after internal quality tests found faulty high-voltage battery cells in certain models between 2023 and 2025. Those affected include the ID.3, ID.4, ID.7 and ID. Buzz and the Cupra Born. As an immediate measure, charging will be limited to a maximum of 80 percent, and affected customers will be informed in writing.
VW is preparing to recall several thousand vehicles from the ID. family in Germany after internal quality tests discovered faulty high-voltage battery cells due to production errors at suppliers. In rare cases, this could lead to increased thermal stress and, in extreme cases, fire. As an immediate measure, charging will be limited to 80 percent. Recalls are already underway in Great Britain and the USA, with over 22,000 ID.4s affected in the USA. The recall follows a million-dollar recall at the end of September due to a corrosion-prone screw on the steering.
Germany and France have agreed on a common position that envisages a further relaxation of the ban on internal combustion engines by 2035 and includes Great Britain in the definition of "made in Europe".

In the draft budget for 2027, the federal government is planning a drastic cut in e-bus funding from around 403 to around 130 million euros. Transport associations warn of the failure of European climate targets and damage to German manufacturers.

The use of emergency call boxes on German motorways is declining sharply due to widespread mobile phone use. Autobahn GmbH is therefore examining the continued existence of the system in order to reduce costs while maintaining traffic safety. There are still around 17,000 columns nationwide, the maintenance of which cost 4.5 million euros in 2025.

BMW plans to transform itself into an “AI-orchestrated company” by 2028 through the use of artificial intelligence. Purchasing serves as a pioneer where autonomous agents like “Mr. Flexibility” will control processes and save billions in the future.