Breaking
TRBreaking News... Another dead body was found in the flood disaster in Istanbul: The number of deaths increased to 3CNThe 140th Canton Fair welcomes visitors with “hard-core” technology products attracting attentionKRPresident Lee appoints Kim Ji-yong... The gap in the head of the Heavy Water Administration was resolved within two weeks of its launch.KRIndefinite prisoner released after 17 years with retrial for ‘taxi driver murder’ begins, “I can’t help but cry”ITRusso (Conftrasporto), without government responses there is a risk of national shutdownTRWhen will the rain stop in Istanbul? The date has been given, the danger continues. Just when it's over, a new one comesBRVideos from g1 Bahia and TV Bahia - Thursday, October 15, 2026USHow lower fuel economy targets could boost pickups and V-8 enginesCNXi Jinping’s “100,000 in five years” invitation: Is it to build a bridge or dig a hole?BRPalmas records four homicides in one week; Tocantins has more than 180 cases in 2026TRBreaking News... Another dead body was found in the flood disaster in Istanbul: The number of deaths increased to 3CNThe 140th Canton Fair welcomes visitors with “hard-core” technology products attracting attentionKRPresident Lee appoints Kim Ji-yong... The gap in the head of the Heavy Water Administration was resolved within two weeks of its launch.KRIndefinite prisoner released after 17 years with retrial for ‘taxi driver murder’ begins, “I can’t help but cry”ITRusso (Conftrasporto), without government responses there is a risk of national shutdownTRWhen will the rain stop in Istanbul? The date has been given, the danger continues. Just when it's over, a new one comesBRVideos from g1 Bahia and TV Bahia - Thursday, October 15, 2026USHow lower fuel economy targets could boost pickups and V-8 enginesCNXi Jinping’s “100,000 in five years” invitation: Is it to build a bridge or dig a hole?BRPalmas records four homicides in one week; Tocantins has more than 180 cases in 2026
BackRain crisis at Ford Otosan: Facilities flooded, production did not stop
Rain crisis at Ford Otosan: Facilities flooded, production did not stop
Developing
Cumhuriyet4 hours agoLabor1 min readTürkiyeView original

Rain crisis at Ford Otosan: Facilities flooded, production did not stop

Quick Look

  • It was claimed that many areas of the Ford Otosan factory in Kocaeli were flooded after the rain, which was effective during the day and increased in intensity in the evening.
  • According to Evrensel news, while some production lines were stopped, workers continued to work in other departments.
  • A worker reacted to the working conditions, stating that it was not possible to continue production and demanded that administrative leave be given.

AI-generated summary

Why It Matters

After the rain, which was effective throughout the day and increased in intensity in the evening hours, water accumulation occurred in the Ford Otosan factory in Kocaeli. This led to the halt of some production lines.

Font size

It was claimed that many areas of the Ford Otosan factory were flooded following the rain that was effective throughout the day in Kocaeli and increased in intensity in the evening. According to Evrensel, while some production lines were stopped, workers continued to work in some parts of the factory.

It was reported that many areas within the factory were under water, and although production stopped in some lines, work continued in other departments.

REACTION FROM WORKERS TO OCCUPATIONAL SAFETY

A Ford worker, featured in Evrensel's news, reacted to the working conditions and made the following statement:

We're soaking wet, we're still working. It is not possible for us to continue production under these conditions. Administrative permission should be given as soon as possible. What happens if there is an electrical leak somewhere inside?

CALL TO STOP PRODUCTION

The Fo Workers Bulletin page, founded by Ford Otosan workers, also called on the factory management to "stop production immediately."

What to Watch

AI outlook — possibilities, not facts

  • Ford Otosan management will temporarily stop effective production lines in line with worker reactions and safety concerns.

    Likely · Within days

Open Questions

  • Exactly how much area does water accumulation affect in the factory?
  • How long does it take to stop production?
  • When and how to take worker safety measures

Related Topics

This article was originally published by Cumhuriyet.

Related Stories

More on this topicKocaeli