
The Ministry of Transport announced an investment of 300 million euros to develop and renovate transport infrastructure in Auvergne-Rhône-Alpes as part of the 2030 Olympic and Paralympic Winter Games, financed equally between the State and the region, including work on the TER Grenoble-Veynes line, Savoyard stations, the national road 90 and ski lifts, while nearly two Millions of people are expected at the Games.
AI-generated summary
The 2030 Winter Olympics and Paralympics will be hosted in France, primarily in the Alps, with venues in Savoie, Haute-Savoie, Hautes-Alpes and Lyon. A previous envelope of 342 million euros for rail was announced in June 2025 by the government and the Provence-Alpes-Côte d'Azur region.
Trains, road, cable cars: an envelope of 300 million euros will be devoted to the development and renovation of transport infrastructure in Auvergne-Rhône-Alpes as part of the organization of the 2030 Olympic and Paralympic Winter Games, the Ministry of Transport announced on Friday. These investments will be financed equally between the State and the region.
An envelope “to host this event in the best possible conditions”, launched the Minister of Transport Philippe Tabarot upon his arrival in the region, but also for the “legacy” of the infrastructures which will remain once the Games have passed.
Skip the ad
The State and the region will finance the envelope
“More than 100 million” euros will be devoted to rail, his office specified, in particular to modernize the TER Grenoble-Veynes line, the fourth “branch” of the “railway star” of Veynes, which also serves Marseille, Briançon and Valence.
This town of 3,200 inhabitants in the Hautes-Alpes department nestled in a valley is at the heart of railway investments for the Winter Games.
In June 2025, the government and the Provence-Alpes-Côte d'Azur region had already announced a first envelope in the same framework, including 342 million euros for rail, in particular the Marseille-Briançon line.
The “investment protocol” announced on Friday, less than four years before the Games, also aims to make several Savoyard stations accessible: Montmélian, Albertville, Aime-la-Plagne and Bourg-Saint-Maurice.
Railway, roads and ski lifts financed
In this Tarentaise valley, part of the investments will go, on the road side this time, to the national road 90, a route well known to ski resort regulars, regularly congested during peak periods.
Skip the ad
“Several millions” will also be devoted to the construction of “valley elevators” (ski lifts) in Aime-la-Plagne, where the bobsleigh track will be located, from the station, as well as between Bozel and Courchevel.
Gathered in Albertville, in the Olympic hall built for the 1992 games, ministers Philippe Tabarot, Marina Ferrari and the LR president of Auvergne-Rhône-Alpes Fabrice Pannekoucke also signed the “mobility” amendment to the State-region plan contract (CPER), which represents a multi-year investment of 1.4 billion in “everyday mobility”. In the morning, Philippe Tabarot passed through Lyon Saint-Exupéry airport to launch work on the extension of terminal 2.
2 million people expected during the Olympics
Nearly two million people are expected at the time of the Games: they will have to be transported to the various sites in Savoie, Haute-Savoie, Hautes-Alpes and Lyon (in addition to the speed skating events which will take place in the Netherlands). The removal of Nice from the Olympic map has reduced the distances between the furthest points.
AI outlook — possibilities, not facts
Work to modernize the TER Grenoble-Veynes line will be completed before the opening of the 2030 Winter Olympics.
Likely · Within years
Traffic on National Route 90 during peak season will decrease thanks to planned road improvements.
Possible · Within years

A 14-year-old student entered his school in Aubagne armed with a hunting rifle hidden in a guitar case, shooting his principal and a teacher before being overpowered. His parents were taken into custody.

MP Jason O’Connell is suspected of using smart glasses as a teleprompter in the Welsh Parliament. The incident sparked a debate in Westminster over the security and privacy of these wearable technologies.

Economist Agnès Verdier-Molinié warns presidential candidates against any new tax increases, advocating budgetary rigor and lower taxes to reduce public debt.

France Télévisions informs its users about the use of e-mail addresses, tracking pixels and tracking links for the personalization of its newsletter “L'actu à 7h30” and the management of automatic unsubscriptions.

The Paris police chief, Patrice Faure, announced that there was no agreement on the route of the October 17 demonstration, with the prefecture refusing an arrival in the center of Paris.

MPs voted in committee for a reform replacing the retirement pension increase for three children with a fixed package from 2027. A measure contested, in particular by the army.