BackManar Al Omran Announces Massive Industrial Complex in Saudi Arabia
Manar Al Omran Announces Massive Industrial Complex in Saudi Arabia
NEWS
Saudi Gazette Business37 minutes agoBusiness3 min readSaudi Arabia

Manar Al Omran Announces Massive Industrial Complex in Saudi Arabia

New one-million-square-meter facility aims to vertically integrate scaffolding and formwork manufacturing in the Kingdom

Quick Look

  • Manar Al Omran (MAO) has unveiled a one-million-square-meter industrial complex in Saudi Arabia's Eastern Province.
  • The facility integrates scaffolding, steel, aluminium, and plastic manufacturing to serve giga-projects and global export markets.

AI-generated summary

Why It Matters

Manar Al Omran has been a scaffolding and formwork specialist in Saudi Arabia since 1974.

Font size

Manar Al Omran (MAO), the Kingdom’s scaffolding and formwork specialist since 1974, today announced the MAO Industrial Complex, an integrated industrial manufacturing platform spanning approximately one million square meters in the Eastern Province of the Kingdom of Saudi Arabia.

The development brings together five production factories, a flagship corporate head office and a complete residential community for 7,000 employees, with Saudization ratio crossing 60% and aiming for more, establishing MAO as a fully automated, vertically integrated scaffolding industrial group serving the Kingdom’s construction, energy and infrastructure sectors.

The complex is the largest collaborative investment in MAO’s history and marks the company’s transformation from the region’s scaffolding rental and services leader into a manufacturer of the systems themselves, in steel, cast Iron, aluminium extrusion and casting, and polymer, on a scale designed to serve the Kingdom’s giga-projects, its energy, petrochemical and other sectors and export markets worldwide.

At the heart of the complex is a 750,000-square-meter Industrial Scaffolding & Steel Complex dedicated entirely to MAO’s core business. Eight production facilities operate under one fence: the Kingdom’s one and only certified Ringlock system production line, a tube factory, a Cuplock factory, an engineered formwork factory, structural steel fabrication, shot blasting and powder coating, a dedicated hot-dip galvanizing plant and an in-house maintenance facility. Raw steel enters at one gate and leaves as galvanized, coated, dispatched product at the other, with no process step outsourced. With a daily output of 1,200 metric tons, it will be the largest single-site scaffolding factory in the world.

Alongside the steel complex, a dedicated Steel Cast House, built around a DISAMATIC automated molding line and deploying the most advanced green sand casting technology in the Kingdom, will produce high-volume grey and ductile iron castings: the accessories, fittings, couplers and components that scaffolding systems depend on. The only facility of its kind in the Kingdom, it brings the last outsourced element of the supply chain in-house.

An aluminium extrusion plant adds eight extrusion presses, led by four 12-inch, 50 MN presses, a battery without equal in the GCC and the largest concentration of 12-inch presses in a single location worldwide outside China. These presses allow MAO to produce large hard-alloy sections for scaffolding systems and other complex profiles serving the GCC and export markets. One 10-inch press, two 8-inch presses and one 7-inch press complete the line-up, all dedicated to hard alloys, with an annual capacity of around 200,000 metric tons. In-house powder coating and anodizing plants are core to the project, and a highly sophisticated billet cast house, dedicated to producing world-grade 12-inch hard-alloy billets and fed by recycled scrap and primary metal, lowers the carbon footprint of the product while securing raw material supply for the plant.

A Plastic Composite Factory with thirty-two polypropylene profile extrusion lines and dedicated PVC and PP sheet lines completes the platform, serving construction, infrastructure and industrial clients with profiles, trunking and sheet products. A state-of-the-art R&D engineering office is dedicated to developing innovative solutions for the scaffolding industry, covering demand across the Kingdom and the GCC while leaving room for export markets. Cutting-edge new products have already been developed in collaboration with SABIC and Aramco.

Maher Al Harbi, Chairman, Manar Al Omran said: “For more than fifty years, MAO has supplied the scaffolding that built the Kingdom. Today we are building the factories that will build the next fifty. When this complex is complete, every tube, every rosette, every cup, every casting and every formwork panel a project needs will come from one fence in the Eastern Province, made in Saudi Arabia, by MAO, with nothing outsourced. We are not expanding the manufacturing market. We are resetting its scale.”

Open Questions

  • What is the total capital expenditure for the project?
  • What is the projected completion date for the complex?

Related Topics

This article was originally published by Saudi Gazette Business.

Related Stories

The US Strategic Petroleum Reserve is low, but America is not running out of oil in 14 days
Developing·

The US Strategic Petroleum Reserve is low, but America is not running out of oil in 14 days

Viral claims that the US has only 14 days of oil left misinterpret Strategic Petroleum Reserve data by treating it as the nation's total supply. While the SPR has fallen to 286.6 million barrels — its lowest since 1982 — due to drawdowns under Biden and Trump, the US continues to produce, import, refine, and export millions of barrels daily. The SPR serves as an emergency backup, not the main supply, and its current level reflects reduced crisis response capacity rather than imminent shortage.

Gulf News
2 min read
More on this topicmanar al omran