
Minister of Transport and Infrastructure Abdulkadir Uraloğlu stated that the construction site installation works continue on the 36-kilometer YHT Train Station-Esenboğa Airport Rail System Line.
Minister of Transport and Infrastructure Abdulkadir Uraloğlu announced that work is continuing on the YHT Station-Esenboğa Airport Rail System Line, which will be 36 kilometers long and have 12 stations.
AI-generated summary
YHT Station-Esenboğa Airport Rail System Line project planned in Ankara by the Ministry of Transport and Infrastructure.
Minister of Transport and Infrastructure Abdulkadir Uraloğlu made a statement regarding the YHT Station-Esenboğa Airport Rail System Line. Minister Uraloğlu said, "We will put the 36-kilometer YHT Station-Esenboğa Airport Rail System Line into service with 12 stations. We have completed the site delivery in 3 sections of our line, mobilization and site installation works continue. Preparations for the construction works are continuing at full speed." he said.
12 STATIONS ON 36 KILOMETER LINE
Stating that the project is planned to be 36 kilometers long and with 12 stations, Uraloğlu noted that the line will have a design speed of 120 kilometers per hour. Minister Uraloğlu said, “There will be 4 stations in the 8.5-kilometer YHT Station-Siteler section of the project, 4 stations in the 12-kilometer Siteler-Pursaklar section, and 4 stations in the 15.5-kilometer Pursaklar-Esenboğa section.” he said. Uraloğlu stated that a warehouse, workshop and parking area will also be built within the scope of the Pursaklar-Esenboğa section.

GESTAŞ announced that some ferry services on the Dardanelles Strait and the Islands line have been canceled tomorrow due to adverse weather conditions in the north of the Aegean Sea. There will be no flights at certain hours on Kabatepe-Gökçeada and Geyikli-Bozcaata lines.

Bursa Sea Buses (BUDO) canceled 8 trips due to adverse weather conditions. The canceled flights were planned between Bursa (Mudanya), Istanbul (Kabataş) and Armutlu (İhlas).

Some cancellations were announced for İDO and BUDO voyages for citizens who will use sea transportation on September 28, 2026. While there was no general cancellation decision, some flights on Bursa and Istanbul lines were cancelled.
Minister of Transport and Infrastructure Abdulkadir Uraloğlu announced that with the Çeşmeli-Kızkalesi Highway, where 98 percent physical completion has been achieved, travel time will decrease to 18 minutes and 3 billion 38 million lira will be saved annually.

Minister of Transport and Infrastructure Abdulkadir Uraloğlu announced that the physical realization of the Çeşmeli-Kızkalesi Highway has reached 98 percent. With the project, travel time from 2.5 hours will be reduced to 18 minutes.

Some ferry services operated by Bursa Sea Buses (BUDO) and GESTAŞ were canceled due to adverse weather conditions. While the flights between Bursa-Mudanya and Istanbul-Kabataş and the Gökçeada line were affected, arrangements were made for passenger and vehicle transportation.