Breaking
CNWeng disappeared while catching fish in Rouzongjiao in the early morning of August 8, and his body was found in the morningINTLLula Campaign Accuses Trump of Seeking to Colonize Brazil for ResourcesCNXi Jinping visited the United States to attend the White House state banquet. Representatives of technology giants gathered outside the venue to protest.ARNetanyahu defends the Israeli military campaigns in Iran and Gaza before the United NationsCNA 14-year-old junior high school student in Ruifang District, New Taipei City stabbed a 17-year-old senior high school student with food scissorsRUMassive UAV attack on Ulyanovsk: infrastructure damaged, casualtiesRUThe governor of the Ulyanovsk region announced the continued repelling of a UAV attack in UlyanovskDEThe Bundestag and Bundesrat decide on a new fuel discount and fuel price capBRPiauí Senate candidates confirmed for g1 debate on Friday (25)INUS and Iran discuss phased resolution to reopen Strait of HormuzCNWeng disappeared while catching fish in Rouzongjiao in the early morning of August 8, and his body was found in the morningINTLLula Campaign Accuses Trump of Seeking to Colonize Brazil for ResourcesCNXi Jinping visited the United States to attend the White House state banquet. Representatives of technology giants gathered outside the venue to protest.ARNetanyahu defends the Israeli military campaigns in Iran and Gaza before the United NationsCNA 14-year-old junior high school student in Ruifang District, New Taipei City stabbed a 17-year-old senior high school student with food scissorsRUMassive UAV attack on Ulyanovsk: infrastructure damaged, casualtiesRUThe governor of the Ulyanovsk region announced the continued repelling of a UAV attack in UlyanovskDEThe Bundestag and Bundesrat decide on a new fuel discount and fuel price capBRPiauí Senate candidates confirmed for g1 debate on Friday (25)INUS and Iran discuss phased resolution to reopen Strait of Hormuz
BackComplete closure of the A42 at the Herne motorway junction before the bridge opens
Complete closure of the A42 at the Herne motorway junction before the bridge opens
BREAKING
Die Zeit44 minutes agoTraffic1 min readGermanyView original

Complete closure of the A42 at the Herne motorway junction before the bridge opens

Quick Look

  • The A42 will be fully closed in both directions between Herne-Baukau and Herne-Crange this evening to complete the final construction work on four new bridges.
  • The closure will last until Tuesday morning, after which the bridges will be officially opened.
  • Diversions lead via the A2, A3 and A45.

AI-generated summary

Why It Matters

The A43 is an important north-south connection in the Ruhr area that was never planned for the current load of 90,000 vehicles per day. That is why it is being expanded to six lanes over 28 kilometers between Marl and Witten.

Font size

Shortly before the official opening of the four new bridges at the Herne motorway junction, there will be another full closure due to construction. The A42 will be completely closed in both directions between Herne-Baukau and Herne-Crange this evening at 10 p.m., as the motorway company announced. Diversions run via the A2/A3 and A45 motorways.

The closure lasts until Tuesday morning (September 29th). It should be lifted in the early morning hours in the direction of Oberhausen and by 11 a.m. at the latest in the opposite direction. The newly built bridges are also scheduled to officially go into operation on Tuesday. Thanks to a prefabricated rapid construction method, they were built in just one and a half years with traffic flowing - according to the motorway company, a "record-breaking" construction speed.

The Autobahns 42 and 43 meet at the Herne intersection. The A43 is one of the most important north-south connections in the Ruhr area. However, the motorway was never planned for the current traffic load of 90,000 vehicles per day. That is why it is being expanded to six lanes over 28 kilometers between Marl and Witten. Autobahn GmbH speaks of one of the largest trunk road projects in North Rhine-Westphalia.

Open Questions

  • What are the total costs of expanding the A43 between Marl and Witten?
  • What long-term traffic relief does Autobahn GmbH expect from the six-lane expansion?

Related Topics

This article was originally published by Die Zeit.

Related Stories

Complete closure of the Elbe tunnel and the A7 in Hamburg next weekend
BREAKING·

Complete closure of the Elbe tunnel and the A7 in Hamburg next weekend

The Elbe Tunnel and the A7 in Hamburg will be completely closed next weekend from Friday evening at 10 p.m. to Monday morning at 5 a.m. It is the sixth full closure since the beginning of the year. During the closure, the expansion of the section south of the Elbe Tunnel will be celebrated, which has been expanded to eight lanes and stands on pillars as a bridge structure. The construction of the Altona noise protection tunnel should also be pushed forward.

Die Zeit
2 min read
A45 between Dillenburg and Herborn-West closed due to demolition of the overpass
BREAKING·

A45 between Dillenburg and Herborn-West closed due to demolition of the overpass

Due to the demolition of the Kiefernweg/Herborn-Burg overpass between the Dillenburg and Herborn-West junctions, which is in need of renovation, Autobahn 45 will be closed from Friday evening 10:00 p.m. to Monday morning 5:00 a.m. Traffic will be routed via the U38 and U15 diversions. The structure will not be replaced because an underpass is available as an alternative and noise protection is to be guaranteed as part of the six-lane expansion.

Die Zeit
1 min read
More on this topica42