
AI-generated summary
Germany seeks to expand its offshore wind capacity as part of the energy transition (Energiewende), but faces challenges due to intermittency of renewables, high costs and debates over state subsidies. The He Dreiht park is the first in the country to operate without direct financial support from the government.
Frankfurt (Germany) | AFP Germany inaugurated its largest offshore wind farm in the North Sea this Thursday (17), amid warnings from sector representatives that the industry is facing difficulties.
Located 90 kilometers north of the island of Borkum, close to the border with the Netherlands, the wind farm has 64 turbines, with a total capacity of 960 megawatts (MW).
Named "He Dreiht" ("it is spinning" in the literal translation of the local German dialect), the park cost its operator, EnBW, around 2.4 billion euros ($2.8 billion) and can supply energy to approximately 1.1 million homes, according to the company.
"You invested in this wind farm with a clear vision," German Environment Minister Carsten Schneider said in a speech, adding that the investment was made "at a time when market conditions are not at all easy."
Advertising
US President Donald Trump's campaign against wind energy coincided with a change in Germany's energy policy, shaking up the sector.
Energy Minister Katherina Reiche, from the CDU (Christian Democratic Union), a center-right party, proposed cuts in subsidies for solar and wind energy.
Reiche has advocated for the construction of new gas-fired power plants to help stabilize the electrical grid and offset the intermittency of renewable sources such as wind and solar.
Advertising
Schneider, a center-left Social Democrat, said Germany's goal of tripling its offshore wind capacity to 30 GW by 2030 remains in force.
This Thursday, EnBW CEO Georg Stamatelopoulos stated that uncertainty is hampering the expansion of wind energy.
C-Level
A newsletter with exclusive information for those who need to make decisions
“Are we just going to ignore these projects or let them drag on?” he asked.
He Dreiht is the first wind farm in Germany to operate without state subsidies for the electricity it feeds into the grid.
EnBW relies exclusively on power purchase agreements (PPAs), long-term contracts signed with companies such as Fraport, operator of Frankfurt Airport, and automotive supplier Bosch.
AI outlook — possibilities, not facts
EnBW will seek to expand its offshore wind farms through new PPAs with industrial and commercial companies.
Likely · Within months
The debate over subsidies for renewable energy in Germany will continue, with pressure to reduce state support in the face of public accounts.
Likely · Within weeks
This Wednesday, the ANP is holding the largest oil and gas auctions in Brazil's history, putting 326 blocks up for grabs in the pre-salt and concession basins. The event attracts dozens of global and national oil companies, while facing environmental questions.

Petrobras has identified a new accumulation of oil in the Morpho well, in the Foz do Amazonas Basin, approximately 175 km off the coast of Amapá. The president of the state-owned company, Magda Chambriard, classified the operation as an exploratory success.
Petrobras confirmed a new oil discovery in the Morpho well, located on the Equatorial Margin, Foz do Amazonas basin. Drilling in ultra-deep waters aims to expand the state-owned company's reserves and evaluate the region's exploration potential.

Following drone attacks, Saudi Arabia's East-West oil pipeline was shut down, threatening global oil supplies. Stockpiles at Yanbu last just a week, while the IEA warns of a 6% drop in global oil supply this year.

The IEA projects a drop in global oil demand and continued blockade in the Strait of Hormuz until 2027. Record fuel prices and geopolitical tensions between the US, Iran and Houthi attacks are putting pressure on the market and limiting global supply.

Indústrias Nucleares do Brasil (INB) began studies for private partnerships in uranium exploration in five states. The VGLHH Consortium, contracted via BNDES, must present business models by 2027 to expand production and reduce external dependence.