
FAA nationwide ground suspension lifted after 4 hours and 20 minutes
AI-generated summary
In the United States, on January 11, 2023, a contractor employee accidentally deleted files related to the warning system, delaying the takeoffs and landings of thousands of flights for about 90 minutes. In 2001, when the September 11 terrorist attacks occurred, flight operations were suspended nationwide.
Across the United States, on the afternoon of the 13th (Eastern time), aircraft operations across the country were virtually halted for over four hours due to a problem with the aging air traffic control and communication system.
There was chaos at airports across the U.S. ahead of the weekend due to an unusual situation in which flight operations across the U.S. were halted for several hours.
The U.S. Federal Aviation Administration (FAA) issued a nationwide ground stop at airports across the U.S. at 3:53 p.m. Eastern time on this day (5:53 a.m. on the 14th, Korean time) due to a communication problem affecting the air route control center.
Ground stop is an air traffic flow management measure issued when unexpected situations such as runway closure occur at the destination airport. When a ground stop is issued, the subject aircraft must wait on the ground until further takeoff instructions are issued.
The FAA's nationwide ground suspension was lifted at 8:15 p.m. Eastern U.S. time on this day (10:15 a.m. on the 14th, Korean time), about 4 hours and 20 minutes after it was issued.
Transportation Secretary Sean Duffy pointed out that the aging system was the cause of the control communication system failure at a White House briefing held immediately after the ground suspension was lifted.
“At 3:36 p.m., radar and communications became unstable at air traffic control centers and terminal radar approach control (TRACON) across the country,” Duffy said. “The radar data and communications with the aircraft began to become inconsistent, and at that point we issued a ground stop.”
Minister Duffy said, “The aging system was overloaded and went down,” and added, “None of the newly installed equipment went down.”
Minister Duffy said that the fact that the system was normalized as a result of modifications to reduce overload on the network switch suggests that an old network problem was the cause of the failure, and criticized that the root cause of this situation was the Congress's failure to allocate sufficient budget for air traffic control system improvement.
“There is absolutely no evidence that this was a cyber attack or an artificial intelligence (AI) attack,” Homeland Security Secretary Markwayne Mullen said at the same briefing.
Minister Duffy said that about 3,500 aircraft were in operation at the time the grounding ground was issued. After the ground suspension was issued, there were 30,000 aircraft scheduled to take off from US airports during the day.
According to FlightTrader24, a flight tracking site cited by Reuters, more than 4,700 flights within the United States were canceled and 10,000 were delayed on the 13th. 700 flights scheduled for the 14th have already been canceled.
Aviation analysts said it could take several days for airlines to normalize their flight schedules in the wake of a nationwide suspension that lasted more than four hours, Reuters reported.
The last time the FAA implemented a nationwide flight suspension was on January 11, 2023. At the time, contractor employees accidentally deleted files related to the warning system used to communicate with pilots, delaying the takeoffs and landings of thousands of flights for about 90 minutes.
Prior to this, the nationwide suspension of flight operations occurred in 2001, when the September 11 terrorist attacks occurred.
Reuters pointed out that this was the longest nationwide flight suspension since the September 11 terrorist attacks.
AI outlook — possibilities, not facts
The U.S. Congress will discuss the budget for improving the air traffic control system.
Likely · Within weeks
It will take several days for airlines to normalize their flight schedules.
Likely · Within days

Daegu City will conduct simultaneous inspections of about 5,000 private taxis at three inspection sites, including Samsung Lions Park, from the 16th to the 18th. Focus on checking vehicle cleanliness, seat belts, and fare meter operation.

At Incheon International Airport, a system failure occurred again due to a delay in processing passenger transportation information, causing inconvenience to users of 14 airlines. In the past week, departure-related system failures have occurred three times.

Daegu Transportation Corporation began a full day and night inspection of all 28 trains for the electrical control system in the train, which is believed to be the cause of the breakdown on Metro Line 3. Trains will continue to operate normally during the inspection period.

Citizen anxiety is growing as a series of breakdowns occur on Daegu Metro Line 3. The breakdown on the 7th resulted in a power cut due to a defect in the vehicle's electrical control system, delaying operation, and a safety information text message was sent 30 minutes after the breakdown. Previously, breakdowns and line switch failures occurred on September 7 and 2.

In about two months, three breakdowns and failures have occurred on Daegu Metro Line 3, spreading public inconvenience and anxiety. Daegu City is reviewing special measures and forming a dedicated organization with Daegu Transportation Corporation.

The entire section of Daegu Metro Line 3 between Jisan and Beommul Station was delayed due to a train breakdown, but normalized in about 30 minutes. This accident occurred just one day after a joint special safety inspection by Daegu Transportation Corporation and others, leading to continued anxiety and criticism from citizens.