
AI-generated summary
A fire broke out in the laboratory on the 7th floor of the Chemistry Building of National Tsing Hua University in the evening while conducting chemical reactions. The fire department quickly rushed to the scene to put out the fire.
A fire broke out in the Chemistry Hall of National Tsing Hua University this evening.
A fire broke out in the Chemistry Hall of National Tsing Hua University in the evening. During a chemical reaction in the laboratory on the seventh floor, a water-based substance accidentally burned. Fortunately, firefighters quickly extinguished the fire and no one was trapped or injured.
The Hsinchu City Fire Department accepted the report at 5:33 in the evening and arrived at the 7th floor of the Chemistry Hall of National Tsinghua University at 5:42. The reporter said that there was smoke and fire in the Chemistry Hall at the scene, and it was uncertain whether anyone was trapped. The Puding team initially reported that it was a Level 1 fire alarm and entered the room for inspection.
The fire department dispatched 17 vehicles and 48 police and firefighters to rush to the rescue, and the fire was extinguished at 6:05. At 6:35, the Puding detachment reported that the burning substance was a water-based substance, and the school instructor was conducting a chemical reaction, and the temperature was continuing to cool down.
The fire department initially determined that the cause was a chemical reaction in the laboratory, and the burning product was lithium aluminum hydride (a water-forbidden substance). The exact cause is under investigation by the Fire Investigation Division.

On October 20, the North Channel Bridge of the Hangzhou Bay Cross-sea Railway Bridge, the longest cross-sea railway bridge in the world, was successfully closed, marking that the construction of the bridge has entered the sprint stage of the main project. The bridge is a controlled project of the Tongning-Ningbo High-speed Railway, with a total length of 29.2 kilometers and a design speed of 350 kilometers per hour.

At 14:41 on October 20, 2026, a magnitude 4.6 earthquake occurred in Dachaidan Executive Committee, Haixi Prefecture, Qinghai Province, with a focal depth of 10 kilometers. The Dachaidan Administrative Committee felt the earthquake strongly. So far, no reports of casualties or property losses have been received. All infrastructures are operating stably.

On October 20, after 1,320 days of construction, the 12,673-meter-long Xiangyang No. 2 Tunnel of the Kangyu Section of the west-Chongqing High-speed Railway was successfully completed. The tunnel is located in the hinterland of Daba Mountain, Xuanhan County, Dazhou City, Sichuan Province. It is a Class II high-risk tunnel, laying a solid foundation for the entire line to be completed and opened to traffic on schedule.

An accident occurred in the Qixingtan area of Hualien at noon on the 19th. A man surnamed Chen accidentally fell into the sea and drifted. After receiving a report from his family, the Air Service Corps of the Ministry of Interior dispatched a Black Hawk helicopter to search and rescue the man who fell into the sea, successfully hoisted him up and sent him to hospital for treatment.

The signboard of a motorcycle repair shop on Minzu Road, Xindian District, New Taipei City caught fire around 8 a.m. The fire department dispatched 13 fire trucks and 36 personnel to the rescue and evacuated 9 residents of the same apartment building. The fire was extinguished within 10 minutes and no casualties were caused. The cause of the fire is still under investigation.

The Audit Department report pointed out that 15% to 20% of residential fire alarms in Taiwan are overdue or have been used for more than ten years and may fail at critical moments. The New Taipei City Fire Department explained that applications for residential alarms are mainly for apartments below the fifth floor and open-air apartments, with priority given to groups such as the elderly living alone and low-income households. It also emphasized that installation must be done within three days after receipt. The kitchen must be equipped with a constant-temperature type, and the corridors of large living rooms must be equipped with photoelectric types. For daily maintenance, follow the "press, wipe, and replace" formula.