
AI-generated summary
On August 26, the glacier on the north slope of Langtangli Rang Peak in Nepal broke off at an altitude of about 5,200 meters and caused an ice and rock avalanche, forming a giant mudslide. It hit the Gyirong Port at high speed for about 22 kilometers, causing the destruction of about 0.7 square kilometers and 27 buildings.
On the morning of September 2, news came from the debris flow rescue site in Gyirong County, Shigatse, Tibet: the land rescue channel from Gyirong Town to Gyirong Port has been opened. Rescue personnel, relief supplies and some equipment have entered the core area through land channels and carried out in-depth rescue work.
This is already the eighth day that officers and soldiers of the Armed Police Force have been on the front line of mudslide rescue and rescue. They are racing against time to clear the road, and the rescue pace has not stopped for a moment.
Back to 10 o'clock on August 26, Beijing time, a glacier on the north slope of Langtangli Rang Peak in Nepal broke off at an altitude of about 5,200 meters and caused an ice and rock avalanche. The high altitude quickly fell to about 4,000 meters, eroding the mountain and forming a The giant mudslide hit the Geelong Port at about 1,800 meters above sea level at about 10:30 after impacting for about 22 kilometers at high speed, causing the area of about 0.7 square kilometers and 27 buildings and related ancillary facilities to be razed to the ground.
National highways were cut off, buildings were buried, and people lost contact. This border port located in the southern foothills of the Himalayas fell into a quagmire in an instant.
Disaster is an order. The Armed Police Force immediately activated the emergency response mechanism. The officers and soldiers of the Shigatse Detachment of the Armed Police Tibet Corps stationed in Jilong Town took the lead in gathering, and the reconnaissance team immediately moved forward and quickly maneuvered towards the port.
The national highway leading to the core disaster area is the "lifeline" for emergency rescue. As the advance order was issued, a detachment of the Second Mobile Corps of the Armed Police rushed to the rescue at night with large-scale construction machinery, maneuvered hundreds of kilometers across regions, and arrived at the work site on the night of August 29 to start a tough battle to clear the road.
While making every effort to clear the road, the Armed Police Force cooperated with local emergency departments to continue to carry out secondary disaster prevention and control work such as barrier lake monitoring and slope investigation, and monitored in real time the changes in the water level of the Purepqiang Zangbo barrier lake and the loosening of the mountain to eliminate hidden dangers for the safe operation of officers and soldiers.
At the temporary resettlement site in Jilong Town, the medical service unit of the Shigatse Detachment of the Armed Police Force was stationed simultaneously, adopting a model of "comprehensive inspections during the day and focused follow-up at night" to provide medical treatment, health and epidemic prevention, and psychological counseling services to the affected people and front-line rescuers.
Since the rescue mission began, the olive green figure has always been at the forefront of rescue operations. From the border gate to the resettlement point, from the roaring machinery at the scene to the silent service frontline, the officers and soldiers of the Armed Police Force always put the safety of people's lives first, and use practical actions to build a solid defense line that "people first, life first".
Producer | Sun Chongfeng
Reviewer | Luan Hong
Reporters | Liu Yanming Ruan Xiwen Wang Yanting Li Yang Liu Shuang
Source: Voice of China
AI outlook — possibilities, not facts
Land rescue channels will continue to remain open to support subsequent rescue and material transportation.
Very likely · Within days
The Armed Police Force will continue to carry out secondary disaster prevention and control work such as barrier lake monitoring and slope inspections
Very likely · Within weeks

Jilong County, Shigatse City, Tibet suffered a serious mudslide disaster, and National Highway 216 was washed away. Rescuers overcame high altitudes, complex terrain and bad weather. After several days of hard work, the road was cleared on September 2, providing guarantee for subsequent search and rescue.

After a mudslide disaster occurred in Jilong County, Shigatse City, Tibet, the Ministry of Emergency Management dispatched 796 central enterprise engineering emergency rescue personnel and 522 sets of equipment to carry out road rush, search and rescue, risk monitoring and other work. China Communications Construction Company, China Railway Group and many other state-owned enterprises participated in the rescue and completed tasks such as rushing through the G216 national highway and monitoring the barrier lake.

On the 9th day of the debris flow disaster rescue at the Jilong Port in Tibet, reporters arrived at the core area of the disaster and saw excavators repairing roads, firefighters searching in separate areas, and power gradually restored. China Aneng Rescue Team uses laser video AI monitoring equipment and slope radar to monitor mountain deformation in real time, providing data support for rescue decisions and personnel avoidance. Rescuers overcame difficulties such as deep mud and complex geology and continued to carry out life detection and hidden danger investigation.

The Tibet Autonomous Region Government reported on September 2 that the "8.26" landslide disaster in Kyirong had killed 21 people, left 541 people missing, and found 847 relics. A total of more than 2,300 people, more than 400 vehicles, more than 8,000 sets of equipment and more than 800 drone sorties have been invested in the rescue work. 5.43 tons of supplies have been airdropped. Lighting fixtures, low-voltage power generation vehicles and charging shelters have been deployed in the core area, and 12 base stations have restored communications. The search and rescue area reached 1.591 million square meters, a total of 876 family service calls were answered, and 587 family members were resettled.

On August 26, a debris flow disaster in Nepal affected the Gyirong Port of Gyirong County, Shigatse City, Tibet, China, causing heavy casualties and loss of contact. China's national comprehensive fire rescue team adopts "water, land and air" three-dimensional search and rescue tactics in disaster-stricken areas, combining land hiking, waterway investigation of rivers, aerial drone reconnaissance and material delivery, and using advanced scientific and technological means such as multiple types of drones, slope radars, satellite remote sensing, life detection equipment and Beidou terminals to overcome difficulties such as traffic interruptions, communication obstructions, high-altitude hypoxia and complex burials, and maximize the search scope. As of the morning of September 2, the land rescue channel in the core area has been basically opened, and the rescue team has dynamically adjusted tactics to fully release rescue effectiveness.

After the retaining wall of Songfu Road in Xiaogang District, Kaohsiung City collapsed for the first time on August 28, it collapsed again on the evening of the 30th. Although no casualties were caused, the residents were left in terror at night, and the city government has carried out evacuation and emergency repair operations.