
The total length is 15.76 kilometers, with 15 planned stations, connecting Taoyuan City, Luzhu Dazhu and Qingpu
AI-generated summary
The MRT Green Line is currently in the feasibility study review stage and aims to improve Taoyuan's "1st Ring Road, 3rd Center, and 21st Line" MRT network.
The Ministry of Transportation and Communications’ Railway Administration convened the Executive Yuan’s Council of Engineering, the Ministry of Transportation and Communications, and the Taoyuan City Government for an on-site inspection of the Taoyuan Metro Green Line, to gain a firsthand understanding of the route corridor, stations, and transfer nodes along the line. (Photo provided by the Taoyuan City Rapid Transit Engineering Bureau)
As the Taoyuan Metro network continues to expand, the planned Green Line is designed to connect Taoyuan’s urban core, the Dazhu area of Luzhu District, and Qingpu. Currently in the feasibility study review phase, the Green Line spans approximately 15.76 kilometers and includes 15 planned stations. On the 14th, the Railway Administration of the Ministry of Transportation and Communications convened the Executive Yuan’s Council of Engineering, the Ministry of Transportation and Communications, and the Taoyuan City Government for an on-site inspection to directly assess the route corridor, stations, and transfer nodes. The City’s Rapid Transit Engineering Bureau presented an overview of the overall plan and provided on-site explanations, aiming to better grasp local needs and jointly advance the review process for the Green Line, demonstrating the central and local governments’ commitment to accelerating rail infrastructure development in Taoyuan.
According to the presentation by the Rapid Transit Engineering Bureau, the primary purpose of the metro system is to accommodate development in Taoyuan’s metropolitan core, the Dazhu area of Luzhu District, and the Qingpu High-Speed Rail Special Zone. Under the current plan, the line will integrate with other major rail networks—including the Metro Green Line, Brown Line, Orange Line, Silver Line, Airport MRT, and High-Speed Rail—to form a comprehensive transfer network, maximizing the benefits of the integrated transit system and gradually realizing Taoyuan’s vision of a metro network comprising “one ring, three hubs, and 21 lines.”
The Green Line will utilize a light rail system, starting from the Taoyuan Municipal Stadium, passing through Taoyuan’s urban planning area and the Dazhu area of Luzhu District, and terminating at the Qingpu Asia Silicon Valley Innovation and R&D Center. Spanning approximately 15.76 kilometers, the line includes 12 elevated stations and 3 at-grade stations, with an estimated service population of around 700,000.
Liu Qing-feng, Director of the Rapid Transit Engineering Bureau, stated that the feasibility study report for the Green Line was submitted to the Ministry of Transportation and Communications for review in February and August of this year. This on-site inspection by central authorities allows for a direct assessment of current development conditions along the Green Line—from Taoyuan’s core urban area and Luzhu’s Dazhu district to the Qingpu High-Speed Rail Special Zone—as well as the planning of key stations and transfer nodes, helping to clarify relevant issues arising during the project’s implementation.
Liu Qing-feng noted that this on-site inspection also enhances communication efficiency between central and local governments, ensuring that subsequent reviews are more precise and smooth. Given the Green Line’s critical role in Taoyuan’s overall transportation infrastructure and metro network development, local authorities will fully cooperate with the central government’s review
AI outlook — possibilities, not facts
The Ministry of Transport will continue to review the feasibility study report of the Green Line based on the results of the on-site survey.
Very likely · Within months

China's Ministry of Foreign Affairs has refuted reports that Chinese companies have provided Iran with satellite images of US military bases in Jordan. Previously, the Wall Street Journal claimed that Iran used such data to launch attacks on bases, resulting in the deaths of three US troops. U.S. President Trump responded by saying that both China and the United States are conducting mutual surveillance.

New Taipei City Councilor Yan Weici questioned the progress of Sanchong Fruit and Vegetable Market reconstruction and Luzhou Urban Project in the parliament, criticizing the two projects for being stalled and contradictory in content. Yan suggested decoupling the two cases and canceling the Galaxy Bay project. Mayor Hou Youyi said that the city government is conducting a site selection assessment in accordance with the instructions of the Ministry of Interior and will make an announcement once a clear direction is available.

The leaders of the three political parties in England, Wales, Scotland and Northern Ireland met in Cardiff to sign a Memorandum of Understanding (MoU) calling on the UK government to prepare for constitutional change and to recognise all parties' right to self-determination and declare that the era of Westminster is coming to an end.

Hong Kong authorities plan to introduce new incentives for public school mergers to address a shrinking student population, alongside housing and tax measures aimed at countering the city's declining birth rate in the upcoming policy address.

New Taipei mayor candidate Su Qiaohui established the "Catering Industry Support Association" and received support from thousands of catering operators. Su Qiaohui proposed promoting smart catering and job redesign to alleviate labor shortages, and advocated amending the New Taipei City Food Safety and Hygiene Management Autonomy Ordinance to expand the implementation of "3 Chapters 1Q" to ensure food safety.

US Energy Secretary Chris Wright confirmed that the US blocked Iranian nuclear chief Mohammad Eslami from attending a UN nuclear agency conference in Vienna, citing his status as a sanctioned individual.