
Adif temporarily interrupts circulation between Sant Vicenç dels Horts and El Prat de Llobregat due to an electrical fault caused by the rains.
The storm in Catalonia forces Adif to temporarily cut the Madrid-Barcelona high-speed line to repair a breakdown in the electricity supply between Sant Vicenç dels Horts and El Prat de Llobregat, generating delays of up to one hour.
AI-generated summary
A storm in Catalonia affects the railway electricity supply.
The storm that keeps Catalonia on alert this Wednesday has forced Adif to temporarily cut the Madrid-Barcelona high-speed line, with the aim of being able to repair as soon as possible a breakdown that affects the electricity supply between Sant Vicenç dels Horts and El Prat de Llobregat (Barcelona) as a result of the rains.
The decision to interrupt circulation on the line responds to the need to cut the electrical voltage in the catenary in order to repair it. The outage will last an estimated two hours and began at 11:00 a.m., so, if the effects of the storm do not continue to worsen, the reopening should occur around 1:00 p.m. this Wednesday.
Sources from the Ministry of Transport and Sustainable Mobility explain on social networks that the incident is currently generating delays of up to one hour, which could increase if the fault is not repaired as soon as possible. In this regard, Adif insists that its staff is working to solve the incident "as soon as possible."
AI outlook — possibilities, not facts
Reopening of the line around 1:00 p.m.
Likely · Within hours

A suspension of almost five hours in aircraft takeoffs in the US, attributed by the Government to the obsolescence of FAA systems, causes more than 6,600 cancellations and leads to requesting 30.1 billion from Congress.

Renfe offers an alternative route by road and train between Seville and Madrid after the high speed cut due to the Urda accident. The journey lasts nine hours, includes a 137-kilometer bus to Zafra and a regional train with numerous stops in Extremadura. The high-speed line will be out of service for a maximum of 10 days once the judicial authority authorizes the reconstruction works.

An electrical fault between León and Campomanes causes delays on the Madrid-Asturias high-speed line. A train with 368 passengers has been stopped on a viaduct for more than four hours.

Minister Óscar Puente defended Renfe, stating that it is not always responsible for railway delays, attributing a large part of the incidents to external causes such as storms or damage to external works.

A rainy season in Catalonia causes cuts on the Madrid-Barcelona high-speed line due to an electrical fault, delays in Rodalies and around 30 flight cancellations at the Barcelona-El Prat airport.

More than 600 flights were canceled and hundreds were delayed in the UK due to a technical fault in the NATS air traffic control system. The ruling affected major British airports, including Heathrow, Gatwick, Manchester and Edinburgh.