
The Minister of Transport assures that the railway system is "very sensitive" to external factors such as storms or damage to other people's works.
Minister Óscar Puente defended Renfe, stating that it is not always responsible for railway delays, attributing a large part of the incidents to external causes such as storms or damage to external works.
AI-generated summary
The Minister of Transport reacts to the usual criticism about the railway service and delays in the Spanish network.
The Minister of Transport and Sustainable Mobility, Óscar Puente, stated this Thursday that "whore Renfe" is not always responsible for the delays and stops suffered by trains in Spain, alleging that a large number of operational incidents are due to causes beyond the infrastructure itself or the railway service.
In statements to RNE, the head of Transport has regretted the tendency to systematically hold the public company responsible for any type of setback.
"There is a fire next to the tracks, we have to stop the service, the fucking Renfe. There is an incident of this type, the fucking Renfe. And the fucking Renfe, unfortunately, because in a very large percentage of the number of incidents, many times it is not the slightest to blame," Puente asserted.
The minister has given two recent episodes as an example to illustrate how external conditions directly affect circulation. Firstly, he explained that, yesterday, in Catalonia a "tremendous" storm caused a catenary to fall, which forced the suspension of traffic on the high-speed line between Madrid and Barcelona for hours.
Secondly, he referred to a breakdown recorded in Fuencarral (Madrid), caused by work outside the railway workshop: "In some works that take place next to our workshop and the departure of the trains, at a construction site someone touched a gas line, a large gas leak occurred, the firefighters went and we had to stop. And this happens every day," he argued.
Puente has stressed that the railway system is "very sensitive" and very different from the road network, which means that any alteration in the environment immediately impacts daily operations.
In this sense, he has regretted the media and political overexposure that incidents in Spain suffer compared to other countries or modes of transport.

A suspension of almost five hours in aircraft takeoffs in the US, attributed by the Government to the obsolescence of FAA systems, causes more than 6,600 cancellations and leads to requesting 30.1 billion from Congress.

Renfe offers an alternative route by road and train between Seville and Madrid after the high speed cut due to the Urda accident. The journey lasts nine hours, includes a 137-kilometer bus to Zafra and a regional train with numerous stops in Extremadura. The high-speed line will be out of service for a maximum of 10 days once the judicial authority authorizes the reconstruction works.

An electrical fault between León and Campomanes causes delays on the Madrid-Asturias high-speed line. A train with 368 passengers has been stopped on a viaduct for more than four hours.

A rainy season in Catalonia causes cuts on the Madrid-Barcelona high-speed line due to an electrical fault, delays in Rodalies and around 30 flight cancellations at the Barcelona-El Prat airport.

The storm in Catalonia forces Adif to temporarily cut the Madrid-Barcelona high-speed line to repair a breakdown in the electricity supply between Sant Vicenç dels Horts and El Prat de Llobregat, generating delays of up to one hour.

More than 600 flights were canceled and hundreds were delayed in the UK due to a technical fault in the NATS air traffic control system. The ruling affected major British airports, including Heathrow, Gatwick, Manchester and Edinburgh.