
AI-generated summary
Nangang Transfer Station East Station is an important hub of the Taipei East District Gateway Project. It is located in Section 7 of Zhongxiao East Road. The passenger transportation business of the original West Station will be transferred to the East Station, and the original site of the West Station will be returned to the Taiwan Railways. The project aims to connect Nangang Station, the Biotechnology Industry Corridor and the Bannan Line MRT to enhance regional transportation functions.
The "Nangang Transfer Station East Station" in Section 7 of Zhongxiao East Road in Nangang District, an important hub of the Taipei East District Gateway Project, was opened today (15 days). Liu Guozhu, director of the Comprehensive Planning Section of the Public Transport Department, said that the building has 4 underground floors of parking lots and 19 floors above ground including transfer stations, retail shops and offices. Among them, 6 operators including Gamalan Passenger Transport of Nangang Transfer Station West Station, with a total of 12 routes to Keelung, Taoji, Yilan, Hualien and other places, will all be transferred to the East Station from now on; the original site of the West Station will be returned to the Taiwan Railways. Deputy Mayor Li Taixing pointed out that with the opened Biotech Road and Biotech Tunnel, the transportation function of Nangang area will continue to be enhanced.
The Nangang Transfer Station East Station Construction Operation Transfer (BOT) project is located at Section 7 of Zhongxiao East Road, at the intersection of Shengji/Xingzhong Road. On the same side, it can be connected to Nangang Station, and the Nangang Commercial and Commercial Offices under construction. The "Nangang Star" covers Shangsan Transportation Station (long distance or to cooperate with temporary stop dispatch), convention and exhibition, The commercial and residential functions are expected to be completed in 2030; on the other side are the National Biotechnology Research Park Link Road (Biotechnology Road and Biotechnology Tunnel), which was opened on September 28, and Exit 2 of Nangang MRT Station on the Bannan Line of the MRT. Industry, commerce, transportation and life functions are closely connected.
Please read on...
The first floor of Nangang Transfer Station East Station is a national highway passenger terminal, equipped with 9 boarding and alighting platforms and 4 spare platforms. Taylor Passenger Transport 9026 (Keelung Dawulun), Gamalan Passenger Transport 1918 (Hualien), Guoguang Passenger Transport 1843 (Taoji), 1877 (Toucheng/Wushi Port) , 1878 (Yilan City), 1879 (Luodong), 1881A (Jiaoxi), 1032 (Keelung City), 1088 (Keelung Nuannuan), 9069 (Taoyuan) of Keelung, Guide, and Zhongli Passenger Transport, Nangang Ruifang Leaping Frog Bus, and Songshan Station Ruifang Leaping Frog Bus.
Liu Guozhu explained that the number of platforms in the East Station is more sufficient than that of the original West Station, which improves the efficiency of passenger vehicle entry and exit and dispatching. In addition, in response to the electrification trend of national highway passenger fleets, the required pipeline space is simultaneously reserved. Through the bright and spacious waiting hall and intra-station circulation lines, the crowded waiting space during peak hours in the past is improved, and the riding environment is more comfortable and convenient.
The second floor has more resting space for passengers; the first basement floor is for motorcycles, mothers and children, barrier-free parking areas, taxis, and loading and unloading areas; the second to fourth basement floors are open to general parking and electric vehicle areas; the third floor is planned for business supporting facilities and small retail shops, but on-site viewing It was found that the iron gate has been pulled down and has not yet been opened to the public. You can access Nangang Station through the sky corridor. However, it is relatively convenient to cross the Zhongxiao/Xingzhong intersection from the ground floor. The office space from the 4th to 19th floors includes tea rooms, restrooms, shared areas, etc., and is still undergoing detailed adjustments.
The Transportation Department added that the opening of the East Station is an important indicator for the development of public transportation in Taipei East District. Shin Kong Life Insurance participated in the development, and Wandatong Company, which has experience in operating Taipei transfer stations, is responsible for the operation. It cooperates with the landowner, the Ministry of Finance, the Domestic Products Administration, domestic railway and highway authorities and transportation peers to connect the technology and biotechnology industry corridors and drive regional development.
AI outlook — possibilities, not facts
The commercial and retail space on the third floor of Nangang Transfer Station East Station will be opened to the public in the next few months.
Possible · Within months
The East Station office space (4th to 19th floors) will be occupied by tenants after detailed adjustments are completed.
Likely · Within months

The Highway Bureau will conduct mechanical and electrical equipment maintenance at the Guanyinshan Tunnel on Provincial Route 64 at 11 a.m. today, temporarily extinguishing the lighting on partial sections of the two-way road for about 15 minutes, and calls on drivers to turn on their headlights to avoid poor visibility that affects driving safety.

This morning, a two-vehicle accident occurred on the Wugu Interchange Road from Zhongshan Highway to the North. Although it was eliminated within 8 minutes, due to congestion at the peak hours and at the triple interchange exit, the speed of the 5-kilometer section between 27K and 32K dropped to 18 kilometers per hour. The National Highways and Highways Bureau called on passers-by to change lanes as soon as possible.

From the 16th to the 19th, the Hsinchu Public Works Section will carry out nighttime partial road square paving operations from 21:00 every night to 6:00 the next morning on the two-way section of Provincial Highway 1 from Hukou to Zhubei, the southbound lane near the Xiangshan Interchange of National Highway 3, and the southbound section of Provincial Highway 3 from Hengshan Sandpit to Beipu Old Street. Lanes will be allocated to maintain two-way traffic during the construction period, and will be postponed in case of rain.

A fire broke out in a house on Mingyi 7th Street, Ji'an Township, Hualien County at night, and the carport on the first floor was completely burned. Five people in the house successfully escaped. A 64-year-old man named Jian was trapped on the third floor and was choked by thick smoke. He lost breathing and heartbeat. He was sent to Hualien Tzu Chi Hospital for emergency treatment and regained signs of life.

A 9-member mountaineering team went to Jialuo Lake in Datong Township, Yilan County. A 66-year-old female mountaineer surnamed Cai fell away from the team on the way down the mountain and lost contact. After receiving the report, the Yilan County Fire Department launched a search and rescue operation and found the mountain friend near the Jialuo Shrine at 7:54 p.m. and escorted him down the mountain.

The underground railway in Tainan City will be opened to traffic on the 17th, and the Railway Bureau of the Ministry of Transportation will hold a celebration event on the 16th and 17th. Traffic control will be implemented on the western section of Daxue Road and Qianfeng Road around Tainan Main Station. The Transportation Bureau urges passers-by to change routes in advance and use alternative parking spaces.