
AI-generated summary
Keelung has received surprisingly heavy rain recently, causing basements in many communities to get flooded. Residents believe that the failure of the management committee and property management personnel to close the waterproof gates in time was the reason for the expansion of the disaster.
◎ Rao Houle
A few days ago, Keelung received an astonishingly heavy rain, causing water to enter the basements of many communities. Residents blamed the management committee and property management personnel for not closing the waterproof gates in time; diagram. (File photo)
The heavy rain came into force, and Keelung received an astonishing amount of rain. Water entered the basements of many communities, causing incalculable losses. Residents blamed the management committee and property management staff for not closing the waterproof gates in time.
Waterproof gates are already a standard feature of buildings, but the drama of waterproof gates not functioning occurs again and again. In addition to operational and training factors, the decision-making characteristics and adaptability of apartment buildings must also be considered to effectively reduce losses.
Please read on...
Apartment buildings don't allow for quick decisions like single-ownership buildings. In an equal rights environment, the management committee is only able to handle daily management and maintenance work. The regulations do not stipulate that the management committee or property personnel are authorized to close the waterproof gates when a disaster occurs. This puts us in a dilemma when a flood comes.
For example, the management committee has closed the gate, but when the residents are about to drive out, they threaten that the management committee will be responsible for the damage if the gate is not released. Or someone drives back and finds they can't get into the basement, threatening to make the property management pay for all the risks of parking the vehicle outside. Management committee members or property management personnel are therefore exhausted from disassembling and assembling.
Residents of the community building wonder how long it will rain? How high will the water reach? How is it safer to store the car in the basement or park it on a nearby viaduct? The head of the local government was scolded for misarranging the typhoon holiday, but the apartment building management committee had to bear the huge pressure to compensate for the losses!
To close the waterproof gates of a community building that lacks weather forecasting capabilities and hydrological conditions is a disaster decision that should be made by the government.
The author believes that the government should decide when to close the waterproof gates instead of the community building. (File photo)
Just as the government issues water gate closing messages based on weather information, local government water conservancy units should analyze flooding potential and advise the public on which areas and when waterproof gates should be closed in the future, leaving apartment building residents time to make pre-judgments and preparations for their own needs. As long as the community building closes the gates in accordance with the government warning time in the statute or in the resolution of the separate owner meeting, the management committee or property management personnel do not need to bear the risk of decision-making, and residents do not need to fight over differences in their own needs or subjective judgments. Only the waterproof gate function can be truly displayed.
(The author is the chairman of the Taiwan Apartment Building Management Consultants Association)

The Taoyuan City Water Affairs Bureau completed the stormwater sewer improvement project on Shanghai Road in Pingzhen District. It used SPR lining and excavation-free construction methods to repair an old box culvert that was more than 30 years old. The total length is about 130 meters and serves a 120-hectare water catchment area. It improved drainage efficiency and reduced the risk of flooding. During the construction period, road traffic was not affected or flooding was caused.

Keelung Heping Island Geopark is included in the management of the North Coast and Guanyin Mountain National Scenic Areas. After more than ten years of rest and restoration and no fishing, the intertidal zone is rich in ecology, with swimming paddle crabs, devil sea urchins, bead snails and other species appearing. The park cooperates with Environmentally Friendly Seeds to launch a season-limited night tour "Island Day Tour" from May to October, leading the public to observe intertidal creatures.

The Kenting National Park Management Office and ecological experts launched the "Return Crabs to Nature" initiative, pointing out that it is extremely difficult for terrestrial hermit crabs to survive in artificial environments. 100% of the individuals sold on the market are caught in the wild. Current laws and regulations are difficult to enforce. Citizen awareness and education are needed to break the chain of harm from trade to protect the coastal ecology of the Hengchun Peninsula.

The Hengchun Peninsula was once a paradise for land crabs with the highest diversity in the world. However, in recent years, due to the invasion of exotic yellow crazy ants, illegal commercial capture and regulatory loopholes, almost all large land hermit crabs have disappeared, and coastal forests have become dead. Scholars have called for the strengthening of habitat conservation and law enforcement.
Affected by the tropical low pressure, strong winds and rain will occur in Hainan Island. In the next three days, there will be obvious wind and rain in southern South China and the southern sea. Hainan Island has heavy rainfall and a high risk of disasters. It is rainy in the southwest, and strong convective weather such as local wind and hail needs to be guarded against in the northeast.

Thousands protested in Bengaluru's Lalbagh Botanical Garden against a Karnataka law permitting up to 5% of protected parkland for public infrastructure, which could affect 12 acres of Lalbagh and 15 acres of Cubbon Park. The protest follows earlier opposition to a metro line and now targets a tunnel road project requiring felling of 900 mature trees, reflecting broader global urban struggles over green space as cities face space constraints.