
AI-generated summary
The Taipei City Parking Management Office has launched a pilot plan 2.0 for motorcycles and large heavy-duty vehicles to share parking spaces. Starting from October 6, approximately 63,000 public roadside paid motorcycle spaces will be fully opened for the parking of red and yellow-branded large heavy-duty vehicles.
2026/09/28 10:02 Text/Reporter Chen Yingjie
(File photo)
Parking of large and heavy motorcycles will become more convenient in the future. The Taipei City Parking Management Office announced the "Pilot Plan 2.0 for Sharing Spaces for Locomotives and Large Heavy Machines." Starting from October 6, 2026, approximately 63,000 public roadside toll motorcycle spaces within the jurisdiction will be fully opened for the legal parking of red and yellow large heavy machines.
According to the new regulations, heavy-duty motorcycles can be parked at an angle and occupy 2 motorcycle compartments, and will be charged on a per-time basis, with a fee of 40 yuan each time. If you work 24 days a month, the monthly parking fee is about NT$960. Compared with the average monthly off-street parking lot of about NT$2,400, parking expenses can be reduced by about NT$1,440.
Please read on...
However, if the motorcycle body is larger or cannot be parked in the motorcycle compartment due to the installation of a rear box or other equipment, you can still choose to park in the car compartment and the parking rate will be charged according to the car parking rate.
The parking management office also reminded that this full opening is limited to public roadside toll motorcycle parking spaces, and not all motorcycle parking spaces are applicable. If a heavy-duty vehicle with a red or yellow plate is parked in a free motorcycle space in an unpaid alley, or in a special no-parking section, the police will, in accordance with Article 56 of the "Road Traffic Management Punishment Regulations", impose a fine of NT$600 to NT$1,200 for not parking according to the specified vehicle type, location or method.
Become a fan and see more car information -> "Free Times Auto Channel Fan Group"
Toyota Corolla facelift expected to debut in 2027
Study: High mileage failure rate of electric vehicles is lower than gasoline vehicles
Fingerprints and scratches are too hard to take care of! Nissan bids farewell to piano black interior design
More test drive videos
No need to draw, no need to grab. Now use the APP to read the news. You are guaranteed to win every day. Click me to download the APP. Click me to see the event details.
Keywords
Large heavy locomotive
Large heavy machinery
yellow card locomotive
red brand heavy locomotive
parking grid
Taipei City

The Nangang Shengji Tunnel in Taipei opened to traffic yesterday, connecting Section 7 of Zhongxiao East Road with the entrance road to the National Biotechnology Park, shortening the commute time from Nangang to Xizhi, easing traffic congestion during peak hours, and providing alternate roads and separate lanes for pedestrians and vehicles.

The Taiwan High Speed Rail Corporation has taken advantage of the four consecutive holidays of Mid-Autumn Festival and Teacher's Day. From 1 pm to 8 pm on September 29, trains will run at 4:00 every hour in the direction from Taichung Station to Nangang. The trains are equipped with 9 free seats. The public is urged to take advantage of off-peak hours to avoid peak crowds.

Due to the unsatisfactory land acquisition and the incomplete relocation of the demolished households, the opening date of Taoyuan Airport's third runway has been postponed from 2030 to December 2033 after the completion of operational tests. The third terminal is expected to be completed and opened by the end of next year.

Kaohsiung Xiaogang International Airport will add a three-dimensional parking lot and parking space on the east side by the end of next year. The second and fourth phases of the terminal project are planned to be completed by 2040, which will increase the annual international passenger capacity to 14.9 million passengers. The Kaohsiung City Government and citizens continue to call for the lifting of the curfew to support long-haul flights and cargo demand in the science and technology park. However, the Civil Aviation Administration maintains the curfew on the grounds of maintaining the quality of life of surrounding residents, and points out that the construction of new airports needs to consider environmental protection, international norms and sustainability, and requires long-term wind direction assessment.

Taichung International Airport has been hampered in its expansion due to restrictions on military-civilian use. The existing facilities are unable to cope with the huge increase in the number of passengers. There are more than 30 international routes and the annual traffic volume is estimated to exceed 3 million passengers. However, there are only two luggage carousels and parking is difficult. Legislators He Xinchun, Jiang Qichen, Cai Qichang and experts called for accelerating the construction of the third terminal, improving parking and external transportation, and planning a maintenance area based on the advantages of the aerospace industry. The Ministry of Transportation and the Civil Aviation Administration stated that the overall plan for 2045 is under review.

The Kaohsiung City Public Works Bureau invested 11 million yuan to renovate and adjust the elevation of the 2.4-kilometer-long section 3 of Agongdian Road (from Qianfeng Road to Shanbahata Road) to solve the problem of a maximum height difference of 50 centimeters on the wavy road surface, improve the smoothness and load-bearing capacity of the road, and has been completed and opened to traffic to improve the quality of commuting and industrial transportation.