
AI-generated summary
During the Mid-Autumn Festival, travel demand in the Guangdong-Hong Kong-Macao Greater Bay Area increases. As the largest EMU maintenance base, Shenzhen EMU undertakes the important task of ensuring passenger travel safety.
China News Service, Shenzhen, September 26. Title: Late-night "physical examination" on high-speed trains to protect passengers on their way home during the Mid-Autumn Festival
Authors Guo Jun Long Kunpeng Zou Songlin
During the Mid-Autumn Festival, the Shenzhen EMU, the largest in the Guangdong-Hong Kong-Macao Greater Bay Area, was brightly lit all night and was busy with operations. In order to ensure safe and smooth travel for passengers during the two festivals, nearly 35 EMU trains here undergo comprehensive maintenance and "physical examinations" every night. A group of "EMU doctors" who stick to their posts work meticulously to protect the safety of high-speed rail traffic in the Bay Area.
At 23:00 on the 24th, the night was deep and Shenzhen was still unbearably hot. A Fuxing EMU that completed the Guangzhou-Shenzhen Highway operation slowly drove into the Shenzhen EMU maintenance depot. After the power outage was completed, the night maintenance operation officially started.
Ground maintenance mechanic Ouyang Jianbin carried a camera flashlight and leaned into the narrow ditch to perform chassis maintenance. The trench was densely covered with pipelines and bogies. He held a flashlight and scanned the wheel sets, brake pads, shock absorbers and other core components one by one, paying close attention to every maintenance point without daring to relax at all. "The running section is the 'legs' of the train. Even if a bolt is loose, it may cause a major safety accident. There is no room for carelessness." Ouyang Jianbin said.
In the maintenance depot of Shenzhen EMU, EMU maintenance engineers are working. Photo courtesy of Guangzhou Bureau of China Railway
During the inspection, he keenly discovered that the wear of a brake caliper pad was close to the limit. He immediately took out a measuring tool to measure accurately. After confirming that the limit was exceeded, he immediately notified his colleagues through the intercom to replace it on site. According to reports, the running section of an 8-group EMU needs to check thousands of points. During the overnight operation, the repeated movements of raising and lowering his head for maintenance often made his neck stiff and sore. During the peak passenger flow period during festivals, he needs to complete the maintenance tasks of 4 sets of EMUs every night.
At the brake pad replacement site, mechanic Wang Pan operated with precision and cooperated tacitly. He half-crouched and half-knelt to fix the workpiece, used his strength to remove the old brake pad, and accurately pushed the new brake pad into the slot. With the "click" locking sound, he completed the replacement operation quickly and efficiently. The whole set of movements was skillful and neat.
Under-car chassis maintenance protects driving safety, while in-car facility maintenance takes into account passengers’ travel experience. Mechanic Xu Liang carried a tool kit to inspect the carriage equipment one by one, focusing on seats, electric tea stoves, lighting, toilets and other facilities frequently used by passengers.
"Passengers must be safe and comfortable when traveling," Xu Liang said while checking. He repeatedly pressed the seat cushion to check the elasticity, touched the seat rail to confirm smooth adjustment, opened and closed the small table to test the functional status, and checked for potential equipment hazards one by one. Next to the electric tea stove, he tested the sensitivity of the buttons, connected the water and checked the water status. At the same time, he carefully checked the bathroom door lock, water pressure of the sink, curtain slides, seat charging port and other details. He insisted on ensuring that all equipment was fully covered by "touching, seeing, and actual testing" to ensure the passenger experience.
At 4 o'clock on the 25th, the roof maintenance work was still continuing. Mechanic Liu Xiande climbed onto the narrow roof of the high-speed train and carried out special maintenance focusing on the pantograph, the core power supply component. The pantograph is a key device for the EMU to obtain power and ensure operation. It accurately measures the thickness of the carbon plate, carefully checks various performance indicators, and immediately proceeds to the next maintenance work after confirming that the components are in good condition. When he finished his homework and walked down the stairs, the sky was already turning white, and his hair under the helmet was already soaked with sweat.
During the festival, the online rate of Shenzhen EMU trains is expected to reach 100%. From nightfall to dawn, this group of high-speed rail maintenance personnel work day and night to perform meticulous inspections and repairs, using strict standards to build a defense line for the safe operation of the trains and protect the reunion of thousands of passengers. (over)

Guide Passenger Transport and Tamsui Passenger Transport announced that the 963 "Bali-Banqiao" direct train will be integrated into the full train (main line) from September 30. The total frequency remains unchanged but the commuting time may increase. People are worried about longer commuting times, insufficient replacement capacity of 988 and traffic congestion in Baliduan. Cai Qinan, assistant manager of Tamsui Passenger Transport, said that the reorganization is to allocate transport capacity based on actual passenger conditions, and said that the 988 bus has a substitute function. The holiday service is reduced due to fewer tourists in Baliduan, most of whom switch to cycling.

During the Mid-Autumn Festival and National Day holiday, railways across the country are expected to carry 22.34 million passengers, and plan to operate 1,218 additional passenger trains. As of 8 o'clock today, Railway 12306 has pre-sold more than 132 million holiday tickets. The railway department responded to the peak passenger flow by implementing peak operation charts, adding more trains, optimizing ticket systems, upgrading station services and other measures. At the same time, the Qiongzhou Strait ro-ro passenger ships worked overtime to ensure smooth crossing of the sea.

Yesterday (25th), the day before the Mid-Autumn Festival holiday, saw an influx of passengers heading south on the high-speed rail. Nangang, Taipei, Banqiao and Taoyuan stations were all crowded. The single-day traffic volume reached 348,000 passengers, a record high. Many passengers holding unreserved seats were unable to enter the platform, and even squeezed into reserved carriages to disturb others. The Ministry of Transportation and Taiwan High-Speed Railway call for people to spread out boarding, give priority to passengers in the right seats, and keep door passages clear.

On the first day of the consecutive Mid-Autumn Festival and Teacher's Day holidays (the 25th), the traffic volume on national highways reached three times the average annual average, with heavy traffic on National 1 and 3 sections. The Highway Bureau of the Ministry of Transport implemented ramp closures, high-occupancy control, single fares and other diversion measures. It also predicted that key road sections would be congested in the morning and recommended that southbound road users delay their departure.

The Taichung Transfer Center is expected to be officially opened on November 4. The center has 3 floors of underground parking space and 2 floors of transfer facilities above ground. It is connected to Taichung Railway Station via an air bridge and provides transfer services for cars, motorcycles and buses, aiming to improve urban transportation convenience and safety.

Kuomintang legislator Huang Jianhao pointed out that the Taiwan Railway's "two-rail trains" have long lacked clear parking regulations, causing conflicts among passengers. After questioning, the Taiwan Railways promised to designate a bicycle priority area for vehicles without racks and formulate unified parking and identification marking standards to improve riding convenience and safety.