
AI-generated summary
Since the Enping 24-2 oil field was put into production in October 2014, it has produced a total of more than 12 million tons of crude oil. After more than ten years of continuous development, the oil field's original production platform operating space and drilling well locations have been completely saturated, and a large amount of remaining oil and gas reserves cannot be effectively utilized. In recent years, my country's offshore oil and gas development has insisted on advancing the new and the old simultaneously. While promoting the construction of new projects, it has accelerated the transformation to improve the quality and efficiency of existing oil fields. Tapping the potential and increasing efficiency of old oil fields has become an important support for stable offshore oil and gas production.
Reporters learned from CNOOC today (9th) that as the first expansion adjustment well of the Enping 24-2 oil field was successfully put into production, my country's first 100-meter water depth oil and gas in-situ expansion platform was officially put into use, opening up a new path for tapping the potential and increasing efficiency of old offshore oil fields.
The in-situ expansion platform of the Enping 24-2 oil field, which was put into operation this time, is located in the waters of the Pearl River Mouth Basin about 200 kilometers southwest of Shenzhen, with an operating water depth of nearly 100 meters. The project adopts the innovative model of "installing new modules in situ on old platforms". Without stopping production or reconstructing the original production system, a new operating platform is accurately installed, adding 12 well slots and deploying 16 adjustment wells, effectively breaking the development bottleneck of saturated well locations and limited production capacity on the original platform.
As the main producing oil field in the core of the Pearl River Mouth Basin, Enping 24-2 Oilfield has produced more than 12 million tons of crude oil since it was put into production in October 2014. After more than ten years of continuous development, the oil field's original production platform operating space and drilling well locations have been completely saturated, and a large amount of remaining oil and gas reserves cannot be effectively utilized.
In recent years, my country's offshore oil and gas development has insisted on advancing the new and the old simultaneously. While promoting the construction of new projects, it has accelerated the transformation to improve the quality and efficiency of existing oil fields. Tapping the potential and increasing efficiency of old oil fields has become an important support for stable offshore oil and gas production. The successful implementation of the 100-meter water depth level in-situ expansion technology has further improved my country's deepwater oil and gas development technology system, and has important demonstration significance in consolidating the foundation for stable offshore oil and gas production and improving domestic energy independent guarantee capabilities.
(CCTV News Client CCTV reporter Wang Shiyu Zhang Wei)
AI outlook — possibilities, not facts
This in-situ capacity expansion technology will be promoted and applied in other mature offshore oil fields.
Likely · Within months

Taichung Mayor Lu Xiuyan questioned Taipower’s failure to fulfill China Fire’s commitment to “increase gas and remove coal”. Taipower responded that it will start the dismantling project of coal-fired units 1 and 2 in October as the new gas-fired units come online, and reiterated its goal of achieving medium-heat coal-free power supply by 2034.

The Philippine Department of Trade and Industry stated that ASEAN is cooperating with the East Asian Economic Research Institute to study the establishment of a regional oil reserve mechanism. Indonesia, Singapore, Malaysia, Thailand, and Vietnam have expressed strong willingness to participate, and the United Arab Emirates is willing to supply oil for reserves. The study is expected to be completed in November this year, aiming to respond to potential supply crises and enhance energy security.

Damage to Persian Gulf refineries during the U.S.-Iran war disrupted supply, and the American Automobile Association said the average U.S. diesel price climbed to a record high of $5.9015 per gallon, adding to pressure on farmers and the trucking industry.

Africa's renewable energy sector is expanding rapidly through solar and wind projects, driven by fossil fuel supply shocks and supported by international investments, including significant contributions from China.

The State Council issued the "15th Five-Year Plan for Carbon Peaking Action Plan", which stipulates that the total installed capacity of wind and solar power will reach more than 2.8 billion kilowatts by 2030, an increase of approximately 1 billion kilowatts from the 1.84 billion kilowatts at the end of 2025. The article analyzes the background for setting this goal, including energy security, power demand growth, and "double carbon" goal requirements. It also points out the current challenges such as insufficient consumption and support capabilities, and proposes countermeasures such as optimizing development layout, developing non-electric utilization, and improving energy storage technology.

As of the end of July this year, my country's photovoltaic power generation installed capacity reached 1.286 billion kilowatts, surpassing coal power for the first time and becoming the power category with the largest installed capacity in my country, marking an important stage of progress in my country's green and low-carbon energy transformation.