
AI-generated summary
OAG's Megahubs report ranks global airports based on connectivity. Guangzhou Baiyun International Airport's rise reflects China's broader aviation expansion as carriers increase international flights.
Among the world’s most connected airports, Guangzhou’s hub has posted the fastest rise through the latest rankings, according to an annual list compiled by aviation data firm OAG. And overall, Chinese hubs stood out as carriers expanded their international networks with added flights.
Guangzhou Baiyun International Airport in southern China jumped to 19th place, from 36th last year, in OAG’s Megahubs 2026 report, released on Wednesday. An OAG spokeswoman called its jump the biggest of any airport globally.
The addition of the airport’s third terminal in October has since facilitated air connections throughout the region, including neighbouring Hong Kong and Macau.
Passenger and flight volumes increased “sharply” at the airport in early 2026, reflecting a rebound in air-travel demand, according to the Guangzhou Foreign Affairs Office. The airport now handles 146 international routes, served by 80 airlines.

The Highway Bureau of the Ministry of Transport promoted the zero-violation motorcycle lottery and nationwide safety and health inspection for the first time this year. As of September 13, more than 1.45 million people have registered for the lottery, and the number of violations has dropped by 80% compared with the same period last year; the total number of free motorcycle health inspections has exceeded 990,000.

Train services across central and eastern Netherlands were halted Tuesday following suspected coordinated sabotage. Rail operator ProRail reported that foreign objects were deliberately placed on tracks in approximately 30 separate locations.

The Biotech Road and Biotech Tunnel in Nangang District, Taipei City will be opened to traffic on the 28th. The New Engineering Office has recently collaborated with multiple units to complete a disaster response drill for tunnel traffic accidents and tested the Suhua-grade smoke exhaust system and independent rescue channels to ensure driving safety.

The feasibility study of the Taichung MRT Orange Line (Airport MRT) was approved by the Executive Yuan on August 18. The TMT Bureau has closed the tender for the comprehensive planning report on the same day. The selection will be conducted this week. After the selection is completed, it will enter the comprehensive planning stage. The line starts at Taichung International Airport and ends near the Wufeng Legislative Yuan Democracy Park. It has a total length of 29.23 kilometers, 26 stations, and a total cost of 160.223 billion yuan.

The new construction project of the C1 standard of the Pingtung section of the second east-west expressway between Kaohsiung and Pingtung (Kaohsiung-Pingtung Expressway 2) will hold a groundbreaking ceremony in Jiuru Township on the morning of September 28, with a total length of 0.88 kilometers and a cost of 3.48 billion yuan. It is expected to be completed in 2029; The line is expected to be opened to traffic in 2033, which will shorten the driving time from Jiuru Township to Zuoying High-speed Railway Station in Pingtung to about 20 minutes, and shorten the traveling time from Changzhi Township to Zuoying High-speed Railway Station from 50 minutes to about 30 minutes. It will connect multiple industrial parks in series to support the development of the "Great Southern New Silicon Valley".

Julius Dalay and millions of Filipinos endure a two-hour commute for a 14km journey in Manila due to fragmented public transport. The government's new spending plan aims to improve the system, but planners warn that neglecting existing jeepneys, trains and buses while building costly new projects will not solve Metro Manila's problems.