
Almost 40 years after the 1987 referendum, the Senate has definitively approved the enabling bill on sustainable nuclear energy.
The Italian Senate has definitively approved the delegation bill on sustainable nuclear power, paving the way for the return of the atom to the country via small modular reactors (SMR) by 2033-2034.
AI-generated summary
Italy closed its nuclear power plants following the 1987 referendum.
THE DELEGATION BILL APPROVED
After almost 40 years after the closure of the nuclear power plants, with the 1987 referendum, Italy has a law to reopen them. The Senate has definitively approved the Pichetto delegation bill on sustainable nuclear power. The objective of the new law is to give the country back atomic legislation, which regulates the construction and management of power plants.
Nuclear bill, the Senate definitively approves the text. Meloni: "Common sense choice"
THE SMRs
The aim is to bring small modular reactors (Smr) to Italy. These are motors enclosed in a steel tube, built in a factory and transported to the power plant, installing them in series of 4 or more. They are economical and safer systems than traditional ones. The most modern versions burn waste from old power plants, and are cooled with liquid lead: in the event of a fault, the reactor shuts down and does not explode. SMRs are in the experimental phase: manufacturers plan to put them on the market in the first half of the next decade.
Nuclear, Pichetto Fratin: "Ready in Italy in 2033-2034, it will cover 15% of needs"
THE NUCLEAR ALLIANCE
Italy is not alone in this project. The nuclear alliance was created by France and many countries have joined it, a large portion of Europe is now part of it. The goal is to work together to achieve new generation nuclear power.
Nuclear, where are the power plants in Europe and where we are with modular reactors
THE NEW REACTORS
One of the biggest innovations is the fact that the focus is no longer on large nuclear power plants, but on smaller plants, which can be built in series. To date, there are only two SMRs in commercial operation in the world: the Russian reactor ship and the Chinese modular reactor of 2023. Numerous small modular reactors are being planned, but we will not see them in operation before the 2030s.
What are SMRs, small nuclear reactors: how they work, safety and costs
THE REACTOR IN CANADA
The only G7 country to have a modular reactor under construction is Canada. The works, which began in May 2025, will finish in 2030. The cost is high: 14 billion euros.
Nuclear Energy in Italy, what are the times for new power plants
WHO SELLS HIGHLY ENRICHED URANIUM
Nuclear power plants, large or small, require uranium or plutonium, which Italy does not produce. There is thus a risk of a new dependence on foreign suppliers, perhaps unreliable. At the moment only Russia sells highly enriched uranium.
Nuclear, Pichetto: "It will make Italy an independent country"
HOW WILL EUROPE DO IT?
The West, and in particular Europe, if it wants to focus on this type of nuclear power, must equip itself with the capacity to produce this fuel. At the moment the Old Continent is far behind.
Electricity, 3.5% should come from nuclear power in 2040: what will change? THE DATA
AI outlook — possibilities, not facts
Operation of the first SMRs in Italy between 2033 and 2034
Possible · Within months

EU Energy Commissioner Dan Jorgensen warns of a winter of high energy prices. The EU is evaluating the postponement of the regulation on methane imports and underlines the urgency of reducing dependence on foreign fossil fuels.

EU Energy Commissioner Dan Jorgensen announced that he had instructed the services to evaluate the postponement of the import rules of the methane regulation, due to implementation difficulties.

The Italian Senate has definitively approved the enabling bill for the return to sustainable nuclear power with 81 votes in favour, 51 against and 7 abstentions. The law entrusts the Government with the task of issuing implementing decrees within 12 months to regulate the development of small modular reactors (SMR and AMR) and fusion, with voluntary application mechanisms for territories and safeguard clauses for the national industry.

The Italian energy debate focuses on mini-nuclear reactors (SMR and AMR). Unlike traditional reactors, these are modular, factory-assembled and transportable, but their large-scale commercial deployment is expected no earlier than 2035.

Endesa has started repowering work on the Coriscada wind farm in the Galician municipalities of Mañón and Ortigueira, replacing 40 wind turbines from 1998 with 4 latest generation turbines of 7 MW each, increasing annual production from 47 to 83.9 GWh and reducing the visual impact, with an investment of 36.3 million euros and completion expected by March 2028.

An Irena report, presented at Climate Week in New York, highlights that the world must double the rate of installation of renewables to reach the target of 11.2 TW by 2030, set by the COP28 Consensus.